IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,072

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0293 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,246 $6,782 Implemented
MZ0293 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,924 $910 Implemented
MZ0293 # 04 Y:2020 04 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,596 $4,100 Not Implemented
MZ0293 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $63,762 $88,053 Implemented
MZ0293 # 06 Y:2020 06 2020 INSTALL OCCUPANCY SENSORS $230 $780 Implemented
MZ0293 # 07 Y:2020 07 2020 UTILIZE A LESS EXPENSIVE COOLING METHOD $7,010 $25,500 Not Implemented
MZ0293 # 08 Y:2020 08 2020 OPTIMIZE PLANT POWER FACTOR $328,879 $538,653 Implemented
MZ0293 # 09 Y:2020 09 2020 RECOVER WASTE HEAT FROM EQUIPMENT $11,186 $28,360 Not Implemented
UD1017 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $20,892 $0 Implemented
UD1017 # 02 Y:2020 02 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,500 $0 Implemented
UD1017 # 03 Y:2020 03 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,662 $17,500 Implemented
UD1017 # 04 Y:2020 04 2020 UPGRADE CONTROLS ON COMPRESSORS $2,299 $0 Implemented
UD1017 # 05 Y:2020 05 2020 UPGRADE CONTROLS ON COMPRESSORS $2,128 $500 Not Implemented
UD1017 # 06 Y:2020 06 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $955 $0 Not Implemented
UD1017 # 07 Y:2020 07 2020 OPTIMIZE PLANT POWER FACTOR $25,311 $31,200 Not Implemented
UD1017 # 08 Y:2020 08 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,360 $16,720 Not Implemented
AM0806 # 01 Y:2020 01 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $49,500 $85,000 Not Implemented
AM0806 # 02 Y:2020 02 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,025 $24,685 Not Implemented
AM0806 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,300 $10,600 Implemented
AM0806 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $5,470 $3,350 Implemented
AM0806 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,610 $1,000 Not Implemented
AM0806 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,580 $2,250 Not Implemented
AM0806 # 07 Y:2020 07 2020 USE SYNTHETIC LUBRICANT $1,970 $300 Not Implemented
AM0806 # 08 Y:2020 08 2020 USE COMPRESSOR AIR FILTERS $1,040 $135 Implemented
AM0806 # 09 Y:2020 09 2020 PAY UTILITY BILLS ON TIME $484 $0 Implemented