IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

226

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0340 # 02 Y:2013 02 2013 INSULATE BARE EQUIPMENT $1,696 $1,150 Implemented
SU0340 # 03 Y:2013 03 2013 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $60 $202 Not Implemented
SU0340 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,813 $15,885 Implemented
SU0285 # 01 Y:2009 01 2009 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $95,326 $0 Implemented
SU0285 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,684 $0 Implemented
SU0285 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,037 $0 Not Implemented
SU0285 # 04 Y:2009 04 2009 DISCONNECT BALLASTS $2,387 $0 Not Implemented
SU0285 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,090 $460 Implemented
SU0285 # 06 Y:2009 06 2009 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $67,595 $25,000 Not Implemented
SU0285 # 07 Y:2009 07 2009 INSTALL OCCUPANCY SENSORS $4,200 $2,508 Implemented
SU0285 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,299 $18,800 Implemented
SU0285 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $214 $183 Not Implemented
SU0285 # 10 Y:2009 10 2009 RECOVER WASTE HEAT FROM EQUIPMENT $53,384 $69,621 Not Implemented
SU0285 # 11 Y:2009 11 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $189 $642 Not Implemented
SU0277 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,251 $0 Implemented
SU0277 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,338 $199 Implemented
SU0277 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $789 $575 Implemented
SU0277 # 04 Y:2009 04 2009 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,047 $1,780 Not Implemented
SU0277 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,801 $3,568 Not Implemented
SU0277 # 06 Y:2009 06 2009 REDUCE VENTILATION AIR $6,910 $13,891 Not Implemented
SU0277 # 07 Y:2009 07 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $91 $288 Not Implemented
SU0277 # 08 Y:2009 08 2009 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $10,228 $160,000 Implemented
SU0260 # 01 Y:2007 01 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,228 $0 Implemented
SU0260 # 02 Y:2007 02 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,676 $0 Not Implemented
SU0260 # 03 Y:2007 03 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,312 $0 Not Implemented