IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,821

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0232 # 10 Y:2024 10 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $546 $0 n/a
DL0232 # 11 Y:2024 11 2024 INSULATE BARE EQUIPMENT $500 $340 n/a
DL0232 # 12 Y:2024 12 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,886 $5,000 n/a
DL0232 # 13 Y:2024 13 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,930 $7,995 n/a
AM0891 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $47,100 $10,000 Implemented
AM0891 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,700 $1,000 Implemented
AM0891 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,490 $4,220 Implemented
AM0891 # 04 Y:2024 04 2024 OPTIMIZE PLANT POWER FACTOR $2,710 $7,275 Implemented
AM0891 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $525 $390 Not Implemented
AM0891 # 06 Y:2024 06 2024 USE SYNTHETIC LUBRICANT $340 $980 Not Implemented
AM0891 # 07 Y:2024 07 2024 USE PHOTOCELL CONTROLS $47 $165 Implemented
CW0129 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $10,973 $2,300 n/a
CW0129 # 02 Y:2023 02 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $21,901 $86,580 n/a
CW0129 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $20,343 $37,000 n/a
CW0129 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $951 $180 n/a
CW0129 # 05 Y:2023 05 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $10,872 $21,000 n/a
CW0129 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,398 $72,618 n/a
TT0304 # 01 Y:2023 01 2023 AIR CONDITION ONLY SPACE NECESSARY $74,585 $185,000 n/a
TT0304 # 02 Y:2023 02 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $51,075 $120 n/a
TT0304 # 03 Y:2023 03 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $38,784 $10,000 n/a
TT0304 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $12,488 $40,000 n/a
TT0304 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,867 $5 n/a
TT0304 # 06 Y:2023 06 2023 INSULATE BARE EQUIPMENT $6,857 $372 n/a
TT0304 # 07 Y:2023 07 2023 UPGRADE CONTROLS ON COMPRESSORS $5,133 $300 n/a
TT0304 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,000 $3,000 n/a