IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,072

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0227 # 06 Y:2017 06 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $3,843 $3,460 Implemented
MZ0227 # 07 Y:2017 07 2017 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,295 $3,460 Implemented
WV0543 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,860 $17,381 Implemented
WV0543 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,251 $8,510 Implemented
WV0543 # 03 Y:2017 03 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,081 $0 Not Implemented
WV0543 # 04 Y:2017 04 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,688 $1,000 Not Implemented
WV0543 # 05 Y:2017 05 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,262 $839 Not Implemented
WV0543 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,457 $5,365 Not Implemented
WV0543 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,262 $256 Implemented
WV0543 # 08 Y:2017 08 2017 USE EVAPORATION TO CONCENTRATE MATERIAL $988 $1,050 Not Implemented
WV0543 # 09 Y:2017 09 2017 DEVELOP A REPAIR/REPLACE POLICY $755 $542 Implemented
WV0543 # 10 Y:2017 10 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $700 $39 Implemented
WV0543 # 11 Y:2017 11 2017 INSTALL SET-BACK TIMERS $164 $765 Not Implemented
NL0001 # 01 Y:2017 01 2017 UPGRADE OBSOLETE EQUIPMENT $28,978 $82,175 Not Implemented
NL0001 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $400 $0 Not Implemented
NL0001 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $850 $1,000 Implemented
NL0001 # 04 Y:2017 04 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,808 $0 Not Implemented
NL0001 # 05 Y:2017 05 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,694 $17,700 Not Implemented
NL0001 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,200 $78,000 Implemented
NL0001 # 07 Y:2017 07 2017 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $55,600 $45,000 Implemented
IP0080 # 01 Y:2017 01 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,474 $25 Not Implemented
IP0080 # 02 Y:2017 02 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,305 $155 Not Implemented
IP0080 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $985 $40 Not Implemented
IP0080 # 04 Y:2017 04 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $200 $200 Not Implemented
IP0080 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $194 $208 Not Implemented