Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,126
matching recommendationsNAICS | 32611 | Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0031 # 03 Y:2025 | 03 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $25,779 | $0 | n/a |
SJ0031 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,602 | $4,651 | n/a |
SJ0031 # 02 Y:2025 | 02 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $61,665 | $21,632 | n/a |
SJ0031 # 04 Y:2025 | 04 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $11,204 | $2,890 | n/a |
MU0053 # 06 Y:2024 | 06 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $955 | $0 | n/a |
MU0053 # 11 Y:2024 | 11 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $473 | $140 | n/a |
MU0053 # 09 Y:2024 | 09 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $90 | $0 | n/a |
MU0053 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $79,472 | $58,598 | n/a |
MU0053 # 07 Y:2024 | 07 | 2024 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,119 | $0 | n/a |
MU0053 # 01 Y:2024 | 01 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $456 | $1,958 | n/a |
MU0053 # 03 Y:2024 | 03 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,429 | $4,900 | n/a |
MU0053 # 12 Y:2024 | 12 | 2024 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $210 | $546 | n/a |
MU0053 # 10 Y:2024 | 10 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $16,560 | $17,565 | n/a |
MU0053 # 05 Y:2024 | 05 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $7,196 | $1,904 | n/a |
MU0053 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $439 | $51 | n/a |
MU0053 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $865 | $512 | n/a |
UC2405 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $30,199 | $266,755 | n/a |
UC2405 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $3,906 | $30,482 | n/a |
UC2405 # 01 Y:2024 | 01 | 2024 | PAY UTILITY BILLS ON TIME | $299 | $0 | n/a |
UC2405 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,198 | $1,300 | n/a |
UC2405 # 03 Y:2024 | 03 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,826 | $30 | n/a |
UC2405 # 07 Y:2024 | 07 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,288 | $31,098 | n/a |
UC2405 # 08 Y:2024 | 08 | 2024 | INSULATE BARE EQUIPMENT | $410 | $1,310 | n/a |
UC2405 # 06 Y:2024 | 06 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,409 | $1,997 | n/a |
WV0658 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $12,543 | $934 | Implemented |