IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

472

matching recommendations
Reset
NAICS 32611 Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0835 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,400 $750 Implemented
WV0354 # 03 Y:2007 03 2007 RECOVER WASTE HEAT FROM EQUIPMENT $14,128 $900 Implemented
WV0354 # 05 Y:2007 05 2007 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,489 $1,000 Implemented
WV0354 # 06 Y:2007 06 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,629 $0 Implemented
WV0354 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,596 $32 Implemented
WV0354 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,776 $0 Implemented
WV0354 # 11 Y:2007 11 2007 DEVELOP A REPAIR/REPLACE POLICY $1,190 $408 Implemented
WV0354 # 13 Y:2007 13 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $857 $504 Implemented
LL0267 # 01 Y:2007 01 2007 INSULATE BARE EQUIPMENT $23,653 $3,315 Implemented
LL0267 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,794 $1,280 Implemented
IA0401 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,847 $47 Implemented
IA0401 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,645 $2,882 Implemented
IA0401 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,417 $3,991 Implemented
IA0401 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,519 $194 Implemented
IA0401 # 05 Y:2006 05 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $16,486 $2,500 Implemented
IA0401 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,783 $1,475 Implemented
IA0401 # 08 Y:2006 08 2006 INSULATE BARE EQUIPMENT $1,801 $444 Implemented
IA0401 # 09 Y:2006 09 2006 RECOVER WASTE HEAT FROM EQUIPMENT $7,280 $25,700 Implemented
MI0127 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,532 $33,405 Implemented
MI0127 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,597 $1,074 Implemented
MI0127 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,084 $4,800 Implemented
MI0127 # 08 Y:2006 08 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,107 $3,878 Implemented
WV0340 # 01 Y:2006 01 2006 REPAIR OR REPLACE STEAM TRAPS $80,134 $2,500 Implemented
WV0340 # 02 Y:2006 02 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $42,375 $27,500 Implemented
WV0340 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $8,729 $2,605 Implemented