IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

119

matching recommendations
Reset
NAICS 32611 Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0454 # 02 Y:2018 02 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $554 $300 Implemented
LE0454 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,855 $8,000 Implemented
LE0454 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,301 $23,000 Implemented
LE0454 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $895 $4,400 Implemented
LE0454 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,821 $20,500 Not Implemented
LE0454 # 06 Y:2018 06 2018 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $9,261 $28,000 Not Implemented
LE0454 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,723 $1,500 Implemented
LE0453 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,499 $3,938 Implemented
LE0453 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $1,037 $1,550 Not Implemented
LE0453 # 08 Y:2018 08 2018 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $27,940 $105,000 Not Implemented
LE0453 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,507 $11,250 Implemented
LE0453 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,972 $1,125 Not Implemented
LE0453 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $7,248 $4,000 Not Implemented
LE0453 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $70,484 $4,500 Implemented
LE0453 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,514 $19,688 Implemented
LE0392 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $3,578 $240 Not Implemented
LE0392 # 01 Y:2015 01 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,575 $0 Not Implemented
LE0392 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,170 $520 Not Implemented
LE0392 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $2,407 $1,210 Not Implemented
LE0392 # 06 Y:2015 06 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $887 $468 Not Implemented
LE0392 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,042 $8,300 Not Implemented
LE0392 # 11 Y:2015 11 2015 INSTALL TIMERS AND/OR THERMOSTATS $1,082 $2,210 Not Implemented
LE0392 # 12 Y:2015 12 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $609 $1,733 Not Implemented
LE0392 # 13 Y:2015 13 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $20,472 $70,000 Not Implemented
LE0392 # 14 Y:2015 14 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,425 $10,000 Not Implemented