IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
NAICS 32611 Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0590 # 03 Y:2019 03 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $880 $120 Implemented
SD0590 # 01 Y:2019 01 2019 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $12,001 $8,840 Not Implemented
SD0590 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,948 $0 Implemented
SD0590 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $319 $585 Implemented
SF0400 # 10 Y:2011 10 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $23,990 $67,329 Not Implemented
SF0400 # 12 Y:2011 12 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $171,695 $1,807,809 Not Implemented
SF0400 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,700 $41,732 Not Implemented
SF0400 # 08 Y:2011 08 2011 OPTIMIZE PLANT POWER FACTOR $5,731 $15,119 Not Implemented
SF0400 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,404 $22,616 Not Implemented
SF0400 # 11 Y:2011 11 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $31,158 $170,718 Not Implemented
SF0400 # 05 Y:2011 05 2011 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $48,251 $66,975 Not Implemented
SF0400 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $6,271 $2,850 Not Implemented
SF0400 # 03 Y:2011 03 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $3,063 $712 Not Implemented
SF0400 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,056 $0 Not Implemented
SF0400 # 01 Y:2011 01 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,777 $0 Not Implemented
SF0400 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $9,933 $14,699 Not Implemented
SD0426 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,485 $54,987 Implemented
SD0426 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,632 $94,584 Not Implemented
SD0426 # 05 Y:2010 05 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21,414 $59,920 Not Implemented
SD0426 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,373 $100 Implemented
SD0426 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,943 $1,000 Implemented
SD0426 # 03 Y:2010 03 2010 INSTALL SKYLIGHTS $10,372 $7,660 Not Implemented
SD0347 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,552 $0 Implemented
SD0347 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,721 $21,387 Not Implemented
SD0347 # 04 Y:2004 04 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,700 $18,500 Not Implemented