IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 32611 Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0285 # 01 Y:2009 01 2009 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $95,326 $0 Implemented
SU0285 # 11 Y:2009 11 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $189 $642 Not Implemented
SU0285 # 10 Y:2009 10 2009 RECOVER WASTE HEAT FROM EQUIPMENT $53,384 $69,621 Not Implemented
SU0285 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $214 $183 Not Implemented
SU0285 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,299 $18,800 Implemented
SU0285 # 07 Y:2009 07 2009 INSTALL OCCUPANCY SENSORS $4,200 $2,508 Implemented
SU0285 # 06 Y:2009 06 2009 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $67,595 $25,000 Not Implemented
SU0285 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,090 $460 Implemented
SU0285 # 04 Y:2009 04 2009 DISCONNECT BALLASTS $2,387 $0 Not Implemented
SU0285 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,037 $0 Not Implemented
SU0285 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,684 $0 Implemented
MA0590 # 01 Y:2006 01 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $23,037 $56,931 Implemented
MA0590 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,286 $21,300 Not Implemented
MA0590 # 10 Y:2006 10 2006 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $9,818 $6,420 Implemented
MA0590 # 09 Y:2006 09 2006 INSULATE BARE EQUIPMENT $10,500 $2,000 Implemented
MA0590 # 08 Y:2006 08 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $29,100 $25,000 Not Implemented
MA0590 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,408 $1,000 Implemented
MA0590 # 06 Y:2006 06 2006 RECOVER WASTE HEAT FROM EQUIPMENT $16,603 $3,312 Implemented
MA0590 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,630 $7,000 Not Implemented
MA0590 # 04 Y:2006 04 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $3,100 $3,295 Not Implemented
MA0590 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,393 $12,255 Not Implemented
MA0590 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,269 $30,445 Not Implemented