Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
306
matching recommendationsNAICS | 32611 | Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0209 # 02 Y:2025 | 02 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $4,072 | $0 | n/a |
IP0209 # 03 Y:2025 | 03 | 2025 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $910 | $0 | n/a |
IP0209 # 04 Y:2025 | 04 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $336 | $0 | n/a |
IP0209 # 05 Y:2025 | 05 | 2025 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $9,829 | $238 | n/a |
IP0209 # 06 Y:2025 | 06 | 2025 | INSTALL AUTOMATIC STACK DAMPER | $9,546 | $1,395 | n/a |
IP0209 # 07 Y:2025 | 07 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,200 | $1,306 | n/a |
IP0209 # 01 Y:2025 | 01 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $11,808 | $0 | n/a |
CI0043 # 07 Y:2024 | 07 | 2024 | USE PHOTOCELL CONTROLS | $2,912 | $8,100 | n/a |
CI0043 # 08 Y:2024 | 08 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,248 | $800 | n/a |
CI0043 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $18,838 | $12,100 | n/a |
CI0043 # 01 Y:2024 | 01 | 2024 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $143,742 | $300,000 | n/a |
CI0043 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,970 | $7,350 | n/a |
CI0043 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,106 | $23,794 | n/a |
CI0043 # 06 Y:2024 | 06 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,043 | $1,380 | n/a |
CI0043 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,483 | $12,000 | n/a |
SJ0031 # 02 Y:2025 | 02 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $61,665 | $21,632 | n/a |
SJ0031 # 04 Y:2025 | 04 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $11,204 | $2,890 | n/a |
SJ0031 # 03 Y:2025 | 03 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $25,779 | $0 | n/a |
SJ0031 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,602 | $4,651 | n/a |
MU0053 # 10 Y:2024 | 10 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $16,560 | $17,565 | Not Implemented |
MU0053 # 11 Y:2024 | 11 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $473 | $140 | Implemented |
MU0053 # 09 Y:2024 | 09 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $90 | $0 | Not Implemented |
MU0053 # 03 Y:2024 | 03 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,429 | $4,900 | Implemented |
MU0053 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $79,472 | $58,598 | Implemented |
MU0053 # 05 Y:2024 | 05 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $7,196 | $1,904 | Implemented |