Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
43
matching recommendationsNAICS | 32611 | Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0212 # 08 Y:2022 | 08 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,587 | $13,450 | Not Implemented |
DL0212 # 07 Y:2022 | 07 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $11,396 | $21,500 | Not Implemented |
DL0212 # 10 Y:2022 | 10 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,304 | $22,424 | Not Implemented |
DL0212 # 06 Y:2022 | 06 | 2022 | USE OPTIMUM THICKNESS INSULATION | $692 | $2,233 | Not Implemented |
DL0212 # 05 Y:2022 | 05 | 2022 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $3,655 | $5,200 | Not Implemented |
DL0212 # 09 Y:2022 | 09 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $278 | $210 | Not Implemented |
DL0212 # 04 Y:2022 | 04 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,199 | $6,100 | Not Implemented |
DL0212 # 03 Y:2022 | 03 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $634 | $495 | Not Implemented |
DL0212 # 02 Y:2022 | 02 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,912 | $5,000 | Not Implemented |
DL0212 # 01 Y:2022 | 01 | 2022 | REPAIR FAULTY LOUVERS AND DAMPERS | $20,616 | $975 | Not Implemented |
MZ0335 # 03 Y:2022 | 03 | 2022 | INSULATE BARE EQUIPMENT | $1,834 | $680 | Implemented |
MZ0335 # 08 Y:2022 | 08 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $449 | $200 | Not Implemented |
MZ0335 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $759 | $1,330 | Implemented |
MZ0335 # 07 Y:2022 | 07 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,141 | $9,100 | Not Implemented |
MZ0335 # 05 Y:2022 | 05 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $106,813 | $957,388 | Not Implemented |
MZ0335 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $558 | $480 | Implemented |
MZ0335 # 04 Y:2022 | 04 | 2022 | INSTALL OCCUPANCY SENSORS | $701 | $1,200 | Implemented |
MZ0335 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,654 | $7,600 | Implemented |
WM0184 # 07 Y:2022 | 07 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $87 | $54 | Not Implemented |
WM0184 # 06 Y:2022 | 06 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $592 | $0 | Not Implemented |
WM0184 # 05 Y:2022 | 05 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $779 | $1,030 | Not Implemented |
WM0184 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $844 | $850 | Not Implemented |
WM0184 # 03 Y:2022 | 03 | 2022 | USE RADIANT HEATER FOR SPOT HEATING | $1,517 | $3,265 | Not Implemented |
WM0184 # 02 Y:2022 | 02 | 2022 | INSTALL OCCUPANCY SENSORS | $2,076 | $1,190 | Not Implemented |
WM0184 # 01 Y:2022 | 01 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,492 | $6,200 | Not Implemented |