Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
330
matching recommendationsNAICS | 326111 | Plastics Bag and Pouch Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0053 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $865 | $512 | n/a |
MU0053 # 06 Y:2024 | 06 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $955 | $0 | n/a |
MU0053 # 11 Y:2024 | 11 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $473 | $140 | n/a |
MU0053 # 09 Y:2024 | 09 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $90 | $0 | n/a |
MU0053 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $79,472 | $58,598 | n/a |
MU0053 # 07 Y:2024 | 07 | 2024 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,119 | $0 | n/a |
MU0053 # 01 Y:2024 | 01 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $456 | $1,958 | n/a |
MU0053 # 03 Y:2024 | 03 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,429 | $4,900 | n/a |
MU0053 # 12 Y:2024 | 12 | 2024 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $210 | $546 | n/a |
MU0053 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $439 | $51 | n/a |
MU0053 # 05 Y:2024 | 05 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $7,196 | $1,904 | n/a |
MU0053 # 10 Y:2024 | 10 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $16,560 | $17,565 | n/a |
WV0658 # 07 Y:2024 | 07 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,056 | $7,004 | Implemented |
WV0658 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,787 | $900 | Implemented |
WV0658 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,234 | $90,000 | Not Implemented |
WV0658 # 01 Y:2024 | 01 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $46,042 | $4,000 | Implemented |
WV0658 # 09 Y:2024 | 09 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,325 | $952 | Implemented |
WV0658 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $12,543 | $934 | Implemented |
WV0658 # 05 Y:2024 | 05 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $10,700 | $3,650 | Implemented |
WV0658 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,674 | $10,167 | Not Implemented |
WV0658 # 04 Y:2024 | 04 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $12,305 | $1,500 | Implemented |
UU0225 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,047 | $11,922 | Implemented |
UU0225 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,874 | $0 | Implemented |
UU0225 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,399 | $15,200 | Implemented |
UU0225 # 05 Y:2023 | 05 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,851 | $2,775 | Implemented |