Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsNAICS | 326111 | Plastics Bag and Pouch Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0229 # 13 Y:2012 | 13 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $624 | $1,852 | Implemented |
MI0229 # 12 Y:2012 | 12 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,297 | $460 | Implemented |
MI0229 # 11 Y:2012 | 11 | 2012 | INSTALL SKYLIGHTS | $2,117 | $3,000 | Implemented |
MI0229 # 10 Y:2012 | 10 | 2012 | INSTALL OCCUPANCY SENSORS | $2,325 | $480 | Implemented |
MI0229 # 09 Y:2012 | 09 | 2012 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $5,382 | $385 | Implemented |
MI0229 # 08 Y:2012 | 08 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,849 | $80 | Implemented |
MI0229 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,865 | $1,660 | Implemented |
MI0229 # 06 Y:2012 | 06 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $14,915 | $80 | Implemented |
MI0229 # 03 Y:2012 | 03 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $26,164 | $22,464 | Implemented |
MI0229 # 01 Y:2012 | 01 | 2012 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $69,199 | $111,000 | Implemented |
MI0224 # 10 Y:2012 | 10 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $954 | $1,230 | Implemented |
MI0224 # 08 Y:2012 | 08 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,668 | $80 | Implemented |
MI0224 # 07 Y:2012 | 07 | 2012 | INSTALL OCCUPANCY SENSORS | $1,962 | $520 | Implemented |
MI0224 # 06 Y:2012 | 06 | 2012 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $996 | $2,594 | Implemented |
MI0224 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,130 | $1,660 | Implemented |
MI0224 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,323 | $3,480 | Implemented |
MI0224 # 03 Y:2012 | 03 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,947 | $12,324 | Implemented |
MI0224 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,266 | $11,960 | Implemented |
MI0127 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,532 | $33,405 | Implemented |
MI0127 # 08 Y:2006 | 08 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,107 | $3,878 | Implemented |
MI0127 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $9,084 | $4,800 | Implemented |
MI0127 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,597 | $1,074 | Implemented |