IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
NAICS 326113 Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0454 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $895 $4,400 Implemented
LE0454 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,301 $23,000 Implemented
LE0454 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,855 $8,000 Implemented
LE0454 # 03 Y:2018 03 2018 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $40,361 $48,000 Implemented
LE0454 # 02 Y:2018 02 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $554 $300 Implemented
LE0454 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,723 $1,500 Implemented
LE0453 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,499 $3,938 Implemented
LE0453 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $70,484 $4,500 Implemented
LE0453 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,507 $11,250 Implemented
LE0453 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,514 $19,688 Implemented
LE0373 # 05 Y:2014 05 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,652 $2,400 Implemented
LE0373 # 04 Y:2014 04 2014 INSTALL TIMERS AND/OR THERMOSTATS $3,209 $1,225 Implemented
LE0373 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,233 $1,000 Implemented
LE0373 # 02 Y:2014 02 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $35,793 $130,000 Implemented
LE0373 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,983 $0 Implemented
LE0372 # 11 Y:2014 11 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $9,045 $16,500 Implemented
LE0372 # 08 Y:2014 08 2014 INSTALL TIMERS AND/OR THERMOSTATS $645 $711 Implemented
LE0372 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,294 $1,500 Implemented
LE0317 # 16 Y:2011 16 2011 INSTALL OCCUPANCY SENSORS $153 $1,000 Implemented
LE0317 # 15 Y:2011 15 2011 INSTALL OCCUPANCY SENSORS $1,097 $2,035 Implemented
LE0317 # 01 Y:2011 01 2011 REPLACE BOILER $284,580 $500,000 Implemented
LE0317 # 02 Y:2011 02 2011 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $185,253 $118,000 Implemented
LE0317 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,617 $13,469 Implemented
LE0317 # 06 Y:2011 06 2011 REPAIR OR REPLACE STEAM TRAPS $23,321 $4,200 Implemented
LE0317 # 07 Y:2011 07 2011 RECOVER WASTE HEAT FROM EQUIPMENT $12,721 $22,000 Implemented