IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

522

matching recommendations
Reset
NAICS 326113 Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0759 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,502 $3,367 Implemented
MA0759 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $825 $6,402 Implemented
DL0139 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,375 $19,745 Not Implemented
DL0139 # 02 Y:2015 02 2015 RECOVER WASTE HEAT FROM EQUIPMENT $11,510 $2,330 Not Implemented
DL0139 # 03 Y:2015 03 2015 USE HEAT PUMP FOR SPACE CONDITIONING $4,240 $9,280 Not Implemented
DL0139 # 04 Y:2015 04 2015 REDUCE VENTILATION AIR $850 $0 Not Implemented
DL0139 # 05 Y:2015 05 2015 INSTALL TIMERS AND/OR THERMOSTATS $6,100 $710 Not Implemented
DL0139 # 06 Y:2015 06 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,120 $0 Not Implemented
DL0139 # 07 Y:2015 07 2015 INSTALL TIMERS AND/OR THERMOSTATS $320 $710 Not Implemented
DL0139 # 08 Y:2015 08 2015 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $320 $90 Not Implemented
DL0139 # 09 Y:2015 09 2015 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $810 $700 Not Implemented
DL0139 # 10 Y:2015 10 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,040 $22,500 Not Implemented
WV0481 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,697 $36,851 Not Implemented
WV0481 # 02 Y:2014 02 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $14,611 $72,000 Not Implemented
WV0481 # 03 Y:2014 03 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $10,571 $1,000 Implemented
WV0481 # 04 Y:2014 04 2014 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $5,404 $0 Not Implemented
WV0481 # 05 Y:2014 05 2014 DEVELOP A REPAIR/REPLACE POLICY $3,317 $381 Implemented
WV0481 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $3,285 $4,251 Implemented
WV0481 # 07 Y:2014 07 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,147 $2,480 Not Implemented
WV0481 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $794 $1,293 Implemented
WV0481 # 09 Y:2014 09 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $457 $13 Implemented
AM0652 # 01 Y:2014 01 2014 INSULATE BARE EQUIPMENT $91,770 $1,500 Not Implemented
AM0652 # 02 Y:2014 02 2014 OPTIMIZE PLANT POWER FACTOR $14,900 $37,100 Implemented
AM0652 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,965 $5,090 Not Implemented
AM0652 # 04 Y:2014 04 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,680 $30,600 Implemented