IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
NAICS 326113 Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0481 # 09 Y:2014 09 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $457 $13 Implemented
WV0481 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $794 $1,293 Implemented
WV0481 # 07 Y:2014 07 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,147 $2,480 Not Implemented
WV0481 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $3,285 $4,251 Implemented
WV0481 # 05 Y:2014 05 2014 DEVELOP A REPAIR/REPLACE POLICY $3,317 $381 Implemented
WV0481 # 04 Y:2014 04 2014 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $5,404 $0 Not Implemented
WV0481 # 03 Y:2014 03 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $10,571 $1,000 Implemented
WV0481 # 02 Y:2014 02 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $14,611 $72,000 Not Implemented
WV0481 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,697 $36,851 Not Implemented
AM0652 # 02 Y:2014 02 2014 OPTIMIZE PLANT POWER FACTOR $14,900 $37,100 Implemented
AM0652 # 01 Y:2014 01 2014 INSULATE BARE EQUIPMENT $91,770 $1,500 Not Implemented
AM0652 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,965 $5,090 Not Implemented
AM0652 # 04 Y:2014 04 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,680 $30,600 Implemented
AM0652 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,195 $500 Implemented
AM0652 # 06 Y:2014 06 2014 INSTALL SKYLIGHTS $1,040 $3,790 Not Implemented
AM0652 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $740 $20 Implemented
AM0652 # 08 Y:2014 08 2014 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $320 $0 Implemented
AM0652 # 09 Y:2014 09 2014 USE PHOTOCELL CONTROLS $150 $0 Implemented
LE0373 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,233 $1,000 Implemented
LE0373 # 10 Y:2014 10 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,395 $4,250 Not Implemented
LE0373 # 09 Y:2014 09 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $681 $1,400 Not Implemented
LE0373 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,176 $4,410 Not Implemented
LE0373 # 07 Y:2014 07 2014 REPLACE BOILER $93,869 $72,460 Not Implemented
LE0373 # 06 Y:2014 06 2014 PREHEAT COMBUSTION AIR WITH WASTE HEAT $9,750 $6,900 Not Implemented
LE0373 # 05 Y:2014 05 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,652 $2,400 Implemented