Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
880
matching recommendationsNAICS | 32612 | Plastics Pipe, Pipe Fitting, and Unlaminated Profile Shape Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0177 # 10 Y:2023 | 10 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,349 | $3,260 | n/a |
IP0177 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,732 | $210 | n/a |
IP0177 # 03 Y:2023 | 03 | 2023 | USE OPTIMUM TEMPERATURE | $10,080 | $0 | n/a |
IP0177 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,379 | $0 | n/a |
IP0177 # 05 Y:2023 | 05 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,187 | $0 | n/a |
IP0177 # 07 Y:2023 | 07 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,815 | $653 | n/a |
IP0177 # 08 Y:2023 | 08 | 2023 | INSTALL OCCUPANCY SENSORS | $1,228 | $764 | n/a |
IP0177 # 09 Y:2023 | 09 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,101 | $1,200 | n/a |
IP0177 # 06 Y:2023 | 06 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $91,806 | $8,000 | n/a |
IP0177 # 11 Y:2023 | 11 | 2023 | INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE | $409,614 | $304,570 | n/a |
CI0020 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $92,262 | $487,880 | n/a |
CI0020 # 06 Y:2023 | 06 | 2023 | USE PHOTOCELL CONTROLS | $1,246 | $750 | n/a |
CI0020 # 05 Y:2023 | 05 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,187 | $20,000 | n/a |
CI0020 # 03 Y:2023 | 03 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $55,349 | $45,000 | n/a |
CI0020 # 04 Y:2023 | 04 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,503 | $2,870 | n/a |
CI0020 # 02 Y:2023 | 02 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $76,570 | $180,000 | n/a |
LE0553 # 02 Y:2023 | 02 | 2023 | INSULATE BARE EQUIPMENT | $561 | $416 | n/a |
LE0553 # 05 Y:2023 | 05 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $20,000 | $91,800 | n/a |
LE0553 # 04 Y:2023 | 04 | 2023 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $8,974 | $40,000 | n/a |
LE0553 # 01 Y:2023 | 01 | 2023 | INSULATE BARE EQUIPMENT | $547 | $270 | n/a |
LE0553 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,093 | $22,500 | n/a |
OK1085 # 04 Y:2023 | 04 | 2023 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $15,984 | $2,567 | Implemented |
OK1085 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,322 | $2,730 | Implemented |
OK1085 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,853 | $0 | Implemented |
OK1085 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $72,249 | $820,666 | Not Implemented |