IAC logo
IAC Assessment: UF0622
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0622
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2024
Principal Product PVC Conduit and Fittings
NAICS 326122 - Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084 - Plastics Pipe
Sales $50,000,000-$100,000,000
# of Employees 65
Plant Area (Sq.Ft.) 27,600
Annual Production 50,392,100 Pounds
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $554,742 9,828,939 kWh $0.06
Electricity Demand $69,194 16,274 kW-months/year $4.25
Electricity Fees $28,753 - $ -
LPG $13,023 979 MMBtu $13.30
TOTAL ENERGY COSTS $665,712
RECOMMENDED SAVINGS* $231,789 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$41,219
Cost:
$322,608
$37,137 663,164 $4,082 960 - - $37,137
663,164
kWh
$4,082
960
kW-months/year
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$43,371
Cost:
$52,879
$38,529 688,026 $4,842 1,139 - - $38,529
688,026
kWh
$4,842
1,139
kW-months/year
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$13,853
Cost:
$3,888
$13,853 247,376 - - - - $13,853
247,376
kWh
-
-
kW-months/year
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$10,345
Cost:
$12,420
$9,155 163,477 $1,190 280 - - $9,155
163,477
kWh
$1,190
280
kW-months/year
-
-
$
05: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$10,345
Cost:
$46,500
$8,750 156,250 $1,595 375 - - $8,750
156,250
kWh
$1,595
375
kW-months/year
-
-
$
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$5,789
Cost:
$25,360
$5,789 103,373 - - - - $5,789
103,373
kWh
-
-
kW-months/year
-
-
$
07: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE Savings:
$5,875
Cost:
$6,148
$5,875 104,906 - - - - $5,875
104,906
kWh
-
-
kW-months/year
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,035
Cost:
-
$5,035 88,222 - - - - $5,035
88,222
kWh
-
-
kW-months/year
-
-
$
09: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$16,512
Cost:
$11,225
$16,512 294,868 - - - - $16,512
294,868
kWh
-
-
kW-months/year
-
-
$
10: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS Savings:
$46,005
Cost:
-
$46,005 821,512 - - - - $46,005
821,512
kWh
-
-
kW-months/year
-
-
$
11: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$30,240
Cost:
$788
- - - - $30,240 - -
-
kWh
-
-
kW-months/year
$30,240
-
$
12: 4.463 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS Savings:
$3,200
Cost:
$3,200
- - - - $3,200 - -
-
kWh
-
-
kW-months/year
$3,200
-
$
TOTAL RECOMMENDED Savings:
$231,789
Cost:
$485,016
$186,640 3,331,174 $11,709 2,754 $33,440 - $186,640
3,331,174
kWh
$11,709
2,754
kW-months/year
$33,440
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes