Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
928
matching recommendationsNAICS | 32612 | Plastics Pipe, Pipe Fitting, and Unlaminated Profile Shape Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0168 # 01 Y:2003 | 01 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,831 | $1,000 | Not Implemented |
LE0168 # 02 Y:2003 | 02 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $5,145 | $1,050 | Not Implemented |
LE0168 # 03 Y:2003 | 03 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $1,053 | $1,000 | Not Implemented |
LE0168 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,082 | $100 | Implemented |
LE0168 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,030 | $2,638 | Implemented |
LE0166 # 01 Y:2003 | 01 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,097 | $1,000 | Not Implemented |
LE0166 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $578 | $0 | Not Implemented |
LE0166 # 03 Y:2003 | 03 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,005 | $0 | Not Implemented |
LE0166 # 04 Y:2003 | 04 | 2003 | USE SYNTHETIC LUBRICANT | $17,409 | $1,000 | Not Implemented |
LE0166 # 05 Y:2003 | 05 | 2003 | USE OPTIMUM THICKNESS INSULATION | $13,043 | $2,731 | Implemented |
MI0063 # 01 Y:2003 | 01 | 2003 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $125,255 | $28,140 | Implemented |
MI0063 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $417 | $189 | Not Implemented |
MI0063 # 03 Y:2003 | 03 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $327 | $75 | Not Implemented |
MI0063 # 04 Y:2003 | 04 | 2003 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $15,652 | $4,000 | Not Implemented |
MI0063 # 05 Y:2003 | 05 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,095 | $169 | Implemented |
MI0063 # 06 Y:2003 | 06 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,893 | $4,420 | Implemented |
UD0669 # 01 Y:2003 | 01 | 2003 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $122,772 | $91,650 | Not Implemented |
UD0669 # 02 Y:2003 | 02 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $40,428 | $15,550 | Not Implemented |
UD0669 # 03 Y:2003 | 03 | 2003 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $21,194 | $5,400 | Not Implemented |
UD0669 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,992 | $0 | Not Implemented |
UD0669 # 05 Y:2003 | 05 | 2003 | REDUCE VENTILATION AIR | $11,545 | $0 | Not Implemented |
UD0669 # 06 Y:2003 | 06 | 2003 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $10,502 | $0 | Not Implemented |
UD0669 # 07 Y:2003 | 07 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,865 | $13,600 | Not Implemented |
UD0669 # 08 Y:2003 | 08 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,380 | $1,800 | Not Implemented |
UD0669 # 09 Y:2003 | 09 | 2003 | MINIMIZE WATER USAGE | $5,328 | $10,000 | Implemented |