IAC Assessment: TA0065
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0065
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2003
Principal Product Plastics Hoses
NAICS 326121 - Unlaminated Plastics Profile Shape Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 56,000
Annual Production 10,100 Thousand Feet
Production Hrs. Annual 4,160
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $118,968 2,323,600 kWh $0.05
Electricity Demand $54,694 7,270 kW-months/year $7.52
Electricity Fees $310 - $ -
Natural Gas $23,385 2,955 MMBtu $7.91
TOTAL ENERGY COSTS $197,357
RECOMMENDED SAVINGS* $244,513 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $157,733
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.5194 REDESIGN PROCESS Savings:
$75,086
Cost:
-
$56 1,552 $47 4 - - $74,983 - - - $56
1,552
kWh
$47
4
kW-months/year
-
-
MMBtu
$74,983
-
$
-
-
$
02: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$64,800
Cost:
$5,200
- - - - - - - - $64,800 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$64,800
-
$
03: 3.2136 USE "WASH-LESS" PROCESSING EQUIPMENT Savings:
$49,000
Cost:
$1,768
$565 15,517 $510 44 - - $47,925 - - - $565
15,517
kWh
$510
44
kW-months/year
-
-
MMBtu
$47,925
-
$
-
-
$
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$37,440
Cost:
$1,027
- - - - - - $37,440 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$37,440
-
$
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$11,900
Cost:
-
- - - - - - - - $11,900 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$11,900
-
$
06: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$2,426
Cost:
$6,000
$2,426 66,664 - - - - - - - - $2,426
66,664
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,793
Cost:
-
- - - - - - - - $1,793 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$1,793
-
$
08: 2.1211 MOVE BOILER TO MORE EFFICIENT LOCATION Savings:
$1,422
Cost:
$1,894
$738 20,273 $684 58 - - - - - - $738
20,273
kWh
$684
58
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$306
Cost:
$140
$306 8,414 - - - - - - - - $306
8,414
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
10: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$194
Cost:
-
$101 2,771 $93 8 - - - - - - $101
2,771
kWh
$93
8
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
11: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$146
Cost:
$142
- - - - $146 19 - - - - -
-
kWh
-
-
kW-months/year
$146
19
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$244,513
Cost:
$16,171
$4,192 115,191 $1,334 114 $146 19 $160,348 - $78,493 - $4,192
115,191
kWh
$1,334
114
kW-months/year
$146
19
MMBtu
$160,348
-
$
$78,493
-
$
TOTAL IMPLEMENTED Savings:
$157,733
Cost:
$13,234
$3,526 96,903 $731 62 - - $74,983 - $78,493 - $3,526
96,903
kWh
$731
62
kW-months/year
-
-
MMBtu
$74,983
-
$
$78,493
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes