IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

928

matching recommendations
Reset
NAICS 32612 Plastics Pipe, Pipe Fitting, and Unlaminated Profile Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0669 # 10 Y:2003 10 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,244 $9,025 Implemented
UD0669 # 11 Y:2003 11 2003 PURCHASE APPROPRIATELY SIZED MATERIAL $3,800 $0 Implemented
UD0669 # 12 Y:2003 12 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $2,847 $1,754 Not Implemented
UD0669 # 13 Y:2003 13 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,888 $6,450 Implemented
UD0669 # 14 Y:2003 14 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,679 $142 Implemented
UD0669 # 15 Y:2003 15 2003 INSTALL OCCUPANCY SENSORS $1,622 $177 Not Implemented
UD0669 # 16 Y:2003 16 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $568 $1,026 Implemented
UD0669 # 17 Y:2003 17 2003 UPGRADE CONTROLS ON COMPRESSORS $350 $1,168 Not Implemented
UM0230 # 06 Y:2003 06 2003 USE OPTIMUM THICKNESS INSULATION $4,200 $1,500 Not Implemented
UM0230 # 05 Y:2003 05 2003 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $37,100 $171,200 Not Implemented
UM0230 # 04 Y:2003 04 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,688 $8,100 n/a
UM0230 # 03 Y:2003 03 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $11,163 $4,500 Implemented
UM0230 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,479 $300 Not Implemented
UM0230 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,775 $18,691 Not Implemented
MI0054 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,941 $5,300 Not Implemented
MI0054 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $176 $1 Not Implemented
MI0054 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $768 $14 Not Implemented
MI0054 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,001 $270 Not Implemented
MI0054 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $4,099 $50 Implemented
MI0054 # 06 Y:2003 06 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,007 $2,630 Not Implemented
MI0054 # 07 Y:2003 07 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,325 $3,350 Not Implemented
MI0054 # 08 Y:2003 08 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $16,737 $60 Not Implemented
MI0053 # 01 Y:2003 01 2003 METER WASTE WATER $1,881 $1,454 Not Implemented
MI0053 # 02 Y:2003 02 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $35,000 $7,660 Implemented
MI0053 # 03 Y:2003 03 2003 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $4,563 $654 Not Implemented