IAC logo
IAC Assessment: UD0669
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0669
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2003
Principal Product plastic pellets
NAICS 326121 - Unlaminated Plastics Profile Shape Manufacturing
SIC 3079 -
Sales $100,000,000-$500,000,000
# of Employees 200
Plant Area (Sq.Ft.) 117,031
Annual Production 154,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $790,617 29,937,370 kWh $0.03
Electricity Demand $744,110 59,004 kW-months/year $12.61
Natural Gas $133,027 22,293 MMBtu $5.97
TOTAL ENERGY COSTS $1,736,099
RECOMMENDED SAVINGS* $259,004 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,507
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Raw Material Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Raw Material Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ Tgal
01: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$122,772
Cost:
$91,650
$(-3,742) (-143,920) - - - - - - $(-23,220) - $149,734 - - - $(-3,742)
(-143,920)
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-23,220)
-
$
$149,734
-
$
-
-
Tgal
02: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$40,428
Cost:
$15,550
- - - - - - - - - - - - $40,428 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
$40,428
-
Tgal
03: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$21,194
Cost:
$5,400
- - - - $21,194 3,556 - - - - - - - - -
-
kWh
-
-
kW-months/year
$21,194
3,556
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$15,992
Cost:
-
$9,326 358,680 $6,666 1,537 - - - - - - - - - - $9,326
358,680
kWh
$6,666
1,537
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
05: 2.7314 REDUCE VENTILATION AIR Savings:
$11,545
Cost:
-
- - - - $11,545 1,937 - - - - - - - - -
-
kWh
-
-
kW-months/year
$11,545
1,937
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
06: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$10,502
Cost:
-
- - - - $10,502 1,762 - - - - - - - - -
-
kWh
-
-
kW-months/year
$10,502
1,762
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,865
Cost:
$13,600
$4,586 176,400 $3,279 252 - - - - - - - - - - $4,586
176,400
kWh
$3,279
252
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,380
Cost:
$1,800
- - - - $5,380 903 - - - - - - - - -
-
kWh
-
-
kW-months/year
$5,380
903
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
09: 3.4151 MINIMIZE WATER USAGE Savings:
$5,328
Cost:
$10,000
- - - - - - $5,328 1,040,540 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,328
1,040,540
Tgal
-
-
$
-
-
$
-
-
Tgal
10: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,244
Cost:
$9,025
$3,058 117,600 $2,186 168 - - - - - - - - - - $3,058
117,600
kWh
$2,186
168
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
11: 4.2140 PURCHASE APPROPRIATELY SIZED MATERIAL Savings:
$3,800
Cost:
-
- - - - - - - - - - $3,800 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$3,800
-
$
-
-
Tgal
12: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,847
Cost:
$1,754
$1,660 63,840 $1,187 91 - - - - - - - - - - $1,660
63,840
kWh
$1,187
91
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,888
Cost:
$6,450
$1,101 42,369 $787 60 - - - - - - - - - - $1,101
42,369
kWh
$787
60
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
14: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,679
Cost:
$142
$727 27,965 $952 73 - - - - - - - - - - $727
27,965
kWh
$952
73
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
15: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,622
Cost:
$177
$929 35,742 $693 53 - - - - - - - - - - $929
35,742
kWh
$693
53
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
16: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$568
Cost:
$1,026
$332 12,768 $236 18 - - - - - - - - - - $332
12,768
kWh
$236
18
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
17: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$350
Cost:
$1,168
$350 13,400 - - - - - - - - - - - - $350
13,400
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$259,004
Cost:
$157,742
$18,327 704,844 $15,986 2,252 $48,621 8,158 $5,328 1,040,540 $(-23,220) - $153,534 - $40,428 - $18,327
704,844
kWh
$15,986
2,252
kW-months/year
$48,621
8,158
MMBtu
$5,328
1,040,540
Tgal
$(-23,220)
-
$
$153,534
-
$
$40,428
-
Tgal
TOTAL IMPLEMENTED Savings:
$18,507
Cost:
$26,643
$5,218 200,702 $4,161 319 - - $5,328 1,040,540 - - $3,800 - - - $5,218
200,702
kWh
$4,161
319
kW-months/year
-
-
MMBtu
$5,328
1,040,540
Tgal
-
-
$
$3,800
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Raw Material Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Raw Material Water Consumption