Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
58
matching recommendationsNAICS | 32612 | Plastics Pipe, Pipe Fitting, and Unlaminated Profile Shape Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0043 # 07 Y:2009 | 07 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,009 | $500 | Not Implemented |
MZ0043 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,595 | $20,400 | Implemented |
MZ0043 # 05 Y:2009 | 05 | 2009 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $7,387 | $3,600 | Implemented |
MZ0043 # 06 Y:2009 | 06 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,995 | $1 | Implemented |
MZ0043 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,634 | $860 | Implemented |
MZ0043 # 08 Y:2009 | 08 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $192,075 | $12,080 | Implemented |
MZ0043 # 09 Y:2009 | 09 | 2009 | MOVE BOILER TO MORE EFFICIENT LOCATION | $10,937 | $3,000 | Implemented |
MZ0043 # 03 Y:2009 | 03 | 2009 | INSTALL OCCUPANCY SENSORS | $2,319 | $480 | Implemented |
MZ0043 # 04 Y:2009 | 04 | 2009 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $627 | $1,800 | Implemented |
UD0807 # 16 Y:2009 | 16 | 2009 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,970 | $2,000 | Not Implemented |
UD0807 # 14 Y:2009 | 14 | 2009 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $4,896 | $0 | Not Implemented |
UD0807 # 15 Y:2009 | 15 | 2009 | INSULATE BARE EQUIPMENT | $3,086 | $2,700 | Not Implemented |
UD0807 # 12 Y:2009 | 12 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,249 | $4,614 | Implemented |
UD0807 # 13 Y:2009 | 13 | 2009 | MINIMIZE WATER USAGE | $5,548 | $5,000 | Not Implemented |
UD0807 # 09 Y:2009 | 09 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,425 | $8,602 | Implemented |
UD0807 # 08 Y:2009 | 08 | 2009 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $22,644 | $0 | Not Implemented |
UD0807 # 06 Y:2009 | 06 | 2009 | UPGRADE CONTROLS ON COMPRESSORS | $1,564 | $7,000 | Not Implemented |
UD0807 # 01 Y:2009 | 01 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,275 | $2,000 | Implemented |
UD0807 # 07 Y:2009 | 07 | 2009 | OPTIMIZE PLANT POWER FACTOR | $78,142 | $100,000 | Not Implemented |
UD0807 # 11 Y:2009 | 11 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,719 | $23,924 | Not Implemented |
UD0807 # 10 Y:2009 | 10 | 2009 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $10,853 | $0 | Not Implemented |
UD0807 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,575 | $1,000 | Implemented |
UD0807 # 04 Y:2009 | 04 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,604 | $1,000 | Not Implemented |
UD0807 # 05 Y:2009 | 05 | 2009 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $12,056 | $52,550 | Not Implemented |
UD0807 # 03 Y:2009 | 03 | 2009 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $65,548 | $15,550 | Not Implemented |