Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
185
matching recommendationsNAICS | 32613 | Laminated Plastics Plate, Sheet (except Packaging), and Shape Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2409 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,347 | $15,260 | n/a |
UC2409 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $813 | $75 | n/a |
UC2409 # 01 Y:2024 | 01 | 2024 | PAY UTILITY BILLS ON TIME | $517 | $0 | n/a |
UC2409 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,298 | $1,300 | n/a |
UC2409 # 03 Y:2024 | 03 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $264 | $0 | n/a |
UC2409 # 02 Y:2024 | 02 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $10,580 | $0 | n/a |
UC2409 # 09 Y:2024 | 09 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,316 | $22,456 | n/a |
UC2409 # 08 Y:2024 | 08 | 2024 | REPLACE BOILER | $28,994 | $154,002 | n/a |
UC2409 # 06 Y:2024 | 06 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $957 | $6,632 | n/a |
UC2409 # 10 Y:2024 | 10 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $97,545 | $403,849 | n/a |
MZ1005 # 04 Y:2024 | 04 | 2024 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $14,825 | $110,000 | n/a |
MZ1005 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $478 | $196 | n/a |
MZ1005 # 01 Y:2024 | 01 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $17,664 | $184,235 | n/a |
MZ1005 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $1,143 | $1,200 | n/a |
LE0561 # 03 Y:2024 | 03 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,883 | $1,832 | n/a |
LE0561 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $14,950 | $12,995 | n/a |
LE0561 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,626 | $100 | n/a |
LE0561 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,473 | $1,400 | n/a |
LE0561 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,803 | $5,143 | n/a |
LE0561 # 06 Y:2024 | 06 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $997 | $3,220 | n/a |
MZ0350 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,815 | $440 | Not Implemented |
MZ0350 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,082 | $600 | Implemented |
MZ0350 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $60,709 | $140,732 | Not Implemented |
MZ0350 # 03 Y:2023 | 03 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $8,826 | $2,520 | Not Implemented |
MZ0350 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $9,435 | $9,200 | Implemented |