Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsNAICS | 32613 | Laminated Plastics Plate, Sheet (except Packaging), and Shape Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CI0039 # 02 Y:2024 | 02 | 2024 | INSULATE BARE EQUIPMENT | $44,112 | $5,943 | n/a |
CI0039 # 03 Y:2024 | 03 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $39,711 | $350,000 | n/a |
CI0039 # 04 Y:2024 | 04 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $13,825 | $8,000 | n/a |
CI0039 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,673 | $25,000 | n/a |
CI0039 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,220 | $200 | n/a |
CI0039 # 07 Y:2024 | 07 | 2024 | USE PHOTOCELL CONTROLS | $4,708 | $27,760 | n/a |
CI0039 # 08 Y:2024 | 08 | 2024 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $4,255 | $19,000 | n/a |
CI0039 # 09 Y:2024 | 09 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,503 | $1,600 | n/a |
CI0039 # 10 Y:2024 | 10 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $846 | $50 | n/a |
CI0039 # 11 Y:2024 | 11 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $702 | $0 | n/a |
CI0039 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $149,299 | $539,950 | n/a |
UC2409 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,298 | $1,300 | n/a |
UC2409 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $813 | $75 | n/a |
UC2409 # 03 Y:2024 | 03 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $264 | $0 | n/a |
UC2409 # 02 Y:2024 | 02 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $10,580 | $0 | n/a |
UC2409 # 01 Y:2024 | 01 | 2024 | PAY UTILITY BILLS ON TIME | $517 | $0 | n/a |
UC2409 # 06 Y:2024 | 06 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $957 | $6,632 | n/a |
UC2409 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,347 | $15,260 | n/a |
UC2409 # 08 Y:2024 | 08 | 2024 | REPLACE BOILER | $28,994 | $154,002 | n/a |
UC2409 # 09 Y:2024 | 09 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,316 | $22,456 | n/a |
UC2409 # 10 Y:2024 | 10 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $97,545 | $403,849 | n/a |
MZ1005 # 01 Y:2024 | 01 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $17,664 | $184,235 | Not Implemented |
MZ1005 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $1,143 | $1,200 | Implemented |
MZ1005 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $478 | $196 | Not Implemented |
MZ1005 # 04 Y:2024 | 04 | 2024 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $14,825 | $110,000 | Not Implemented |