Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
223
matching recommendationsNAICS | 32615 | Urethane and Other Foam Product (except Polystyrene) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0591 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $90 | $298 | n/a |
LE0591 # 07 Y:2025 | 07 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,746 | $62,882 | n/a |
LE0591 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,438 | $3,216 | n/a |
LE0591 # 04 Y:2025 | 04 | 2025 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,399 | $4,500 | n/a |
LE0591 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,916 | $5,984 | n/a |
LE0591 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $482 | $140 | n/a |
LE0591 # 01 Y:2025 | 01 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $27,684 | $0 | n/a |
MS0439 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,650 | $0 | n/a |
MS0439 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $586 | $8,100 | n/a |
MS0439 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $2,676 | $7,542 | n/a |
MS0439 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $121,416 | $769,370 | n/a |
MS0439 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $1,314 | $1,810 | n/a |
TR0029 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,939 | $24,345 | Implemented |
TR0029 # 03 Y:2022 | 03 | 2022 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,707 | $2,500 | Not Implemented |
TR0029 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,047 | $5,000 | Implemented |
MI0407 # 03 Y:2022 | 03 | 2022 | INSTALL OCCUPANCY SENSORS | $2,509 | $850 | Not Implemented |
MI0407 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,544 | $2,200 | Not Implemented |
MI0407 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,140 | $7,899 | Implemented |
MI0407 # 04 Y:2022 | 04 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,291 | $580 | Implemented |
MI0407 # 02 Y:2022 | 02 | 2022 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,700 | $3,310 | Not Implemented |
MI0407 # 05 Y:2022 | 05 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,645 | $520 | Not Implemented |
DL0178 # 02 Y:2020 | 02 | 2020 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $470 | $750 | Not Implemented |
DL0178 # 01 Y:2020 | 01 | 2020 | RECOVER AND REUSE COOLING WATER | $13,590 | $4,000 | Not Implemented |
DL0178 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,720 | $2,500 | Not Implemented |
DL0178 # 07 Y:2020 | 07 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,900 | $2,750 | Not Implemented |