IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

211

matching recommendations
Reset
NAICS 32615 Urethane and Other Foam Product (except Polystyrene) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0029 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,047 $5,000 Implemented
TR0029 # 03 Y:2022 03 2022 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,707 $2,500 Not Implemented
TR0029 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,939 $24,345 Implemented
MI0407 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $2,509 $850 Not Implemented
MI0407 # 04 Y:2022 04 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,291 $580 Implemented
MI0407 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,645 $520 Not Implemented
MI0407 # 02 Y:2022 02 2022 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,700 $3,310 Not Implemented
MI0407 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,544 $2,200 Not Implemented
MI0407 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,140 $7,899 Implemented
DL0178 # 01 Y:2020 01 2020 RECOVER AND REUSE COOLING WATER $13,590 $4,000 Not Implemented
DL0178 # 07 Y:2020 07 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,900 $2,750 Not Implemented
DL0178 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,720 $2,500 Not Implemented
DL0178 # 05 Y:2020 05 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $910 $1,000 Not Implemented
DL0178 # 04 Y:2020 04 2020 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $18,880 $10,000 Not Implemented
DL0178 # 03 Y:2020 03 2020 INSTALL TIMERS AND/OR THERMOSTATS $640 $60 Not Implemented
DL0178 # 02 Y:2020 02 2020 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $470 $750 Not Implemented
MA0806 # 03 Y:2019 03 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,496 $71,032 Not Implemented
MA0806 # 01 Y:2019 01 2019 USE SOLAR HEAT FOR HEAT $131,256 $566,995 Implemented
MA0806 # 02 Y:2019 02 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $22,287 $750 Implemented
MA0806 # 04 Y:2019 04 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,289 $15,750 Implemented
MI0308 # 08 Y:2017 08 2017 COMBINE UTILITY METERS $720 $700 Not Implemented
MI0308 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $540 $885 Implemented
MI0308 # 06 Y:2017 06 2017 INCREASE EFFICIENCY OF TRUCKS $5,724 $5,590 Implemented
MI0308 # 01 Y:2017 01 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $39,159 $40,000 Implemented
MI0308 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,766 $3,948 Implemented