Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
479
matching recommendationsNAICS | 326160 | Plastics Bottle Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0085 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,700 | $36,000 | Not Implemented |
TA0085 # 04 Y:2004 | 04 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,840 | $0 | Implemented |
TA0085 # 05 Y:2004 | 05 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,110 | $0 | Implemented |
MA0543 # 01 Y:2003 | 01 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,705 | $21,900 | n/a |
MA0543 # 02 Y:2003 | 02 | 2003 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $26,717 | $40,000 | Not Implemented |
MA0543 # 03 Y:2003 | 03 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,265 | $0 | Not Implemented |
MA0543 # 04 Y:2003 | 04 | 2003 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $5,292 | $0 | Not Implemented |
MA0543 # 05 Y:2003 | 05 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,953 | $12,400 | Not Implemented |
MA0543 # 06 Y:2003 | 06 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,571 | $12,104 | Implemented |
MA0543 # 07 Y:2003 | 07 | 2003 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,408 | $527 | Implemented |
GT0748 # 01 Y:2003 | 01 | 2003 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $116,954 | $2,000 | n/a |
GT0748 # 02 Y:2003 | 02 | 2003 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $44,604 | $85,000 | n/a |
GT0748 # 03 Y:2003 | 03 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $28,809 | $0 | n/a |
GT0748 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,314 | $2,844 | n/a |
GT0748 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,272 | $17,760 | n/a |
GT0748 # 06 Y:2003 | 06 | 2003 | USE OPTIMUM TEMPERATURE | $76,382 | $16,640 | n/a |
GT0748 # 07 Y:2003 | 07 | 2003 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $22,400 | $22,800 | n/a |
GT0748 # 08 Y:2003 | 08 | 2003 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $810,975 | $4,250,000 | n/a |
MS0231 # 01 Y:2003 | 01 | 2003 | OPTIMIZE PLANT POWER FACTOR | $89,273 | $191,565 | Implemented |
MS0231 # 02 Y:2003 | 02 | 2003 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $30,273 | $4,486 | Not Implemented |
MS0231 # 03 Y:2003 | 03 | 2003 | USE SYNTHETIC LUBRICANT | $13,851 | $7,500 | Not Implemented |
MS0231 # 04 Y:2003 | 04 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $15,508 | $26,644 | Not Implemented |
MS0231 # 05 Y:2003 | 05 | 2003 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,811 | $11,139 | Not Implemented |
MS0231 # 06 Y:2003 | 06 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,964 | $3,200 | Not Implemented |
MS0231 # 07 Y:2003 | 07 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,254 | $8,386 | Not Implemented |