IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,921

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0786 # 05 Y:2004 05 2004 CLEAN CONDENSER TUBES $22,690 $3,000 Implemented
GT0786 # 06 Y:2004 06 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $19,500 $0 Not Implemented
GT0786 # 07 Y:2004 07 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,600 $35 Implemented
GT0786 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,040 $3,737 Not Implemented
SU0187 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,725 $0 Not Implemented
SU0187 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,502 $350 Implemented
SU0187 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $513 $442 Not Implemented
SU0187 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $26,177 $53,000 Not Implemented
SU0187 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,721 $10,129 Implemented
SU0187 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $1,206 $3,817 Not Implemented
LM0075 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $757 $175 Implemented
LM0075 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,356 $1,854 Not Implemented
LM0075 # 03 Y:2004 03 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $552 $779 Not Implemented
LM0075 # 04 Y:2004 04 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $156,419 $6,500 Implemented
LM0075 # 05 Y:2004 05 2004 DEVELOP STANDARD OPERATING PROCEDURES $14,640 $6,500 Not Implemented
LM0075 # 06 Y:2004 06 2004 INSULATE BARE EQUIPMENT $309 $101 Implemented
LM0075 # 07 Y:2004 07 2004 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,431 $470 Not Implemented
SU0185 # 01 Y:2004 01 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $95,123 $0 Not Implemented
SU0185 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $19,053 $0 Implemented
SU0185 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $345 $30 Implemented
SU0185 # 04 Y:2004 04 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,959 $92 Implemented
SU0185 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $5,163 $1,069 Not Implemented
SU0185 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $9,676 $30,734 Implemented
BD0258 # 01 Y:2004 01 2004 INSTALL OCCUPANCY SENSORS $2,506 $2,025 Implemented
BD0258 # 02 Y:2004 02 2004 INSTALL OCCUPANCY SENSORS $953 $2,175 Implemented