IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,921

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0037 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,119 $1,204 Implemented
TR0037 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $4,104 $9,500 Implemented
TR0037 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $210,765 $1,396,349 Not Implemented
TR0040 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,084 $4,166 Implemented
TR0040 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $11,309 $128,100 Not Implemented
TR0040 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,078 $15,000 Implemented
MI0422 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $109,428 $738,652 Not Implemented
MI0422 # 02 Y:2023 02 2023 UPGRADE CONTROLS ON COMPRESSORS $37,264 $20,375 Not Implemented
MI0422 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,293 $580 Implemented
MI0422 # 04 Y:2023 04 2023 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,309 $280 Implemented
MI0422 # 05 Y:2023 05 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,579 $4,001 Implemented
MI0422 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $394 $0 Implemented
AS0545 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $45,564 $673,751 Not Implemented
AS0545 # 02 Y:2023 02 2023 UPGRADE CONTROLS ON COMPRESSORS $40,798 $10,720 Not Implemented
AS0545 # 03 Y:2023 03 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $3,883 $1,698 Not Implemented
AS0545 # 04 Y:2023 04 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $174 $8 Not Implemented
KS2311 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,574 $6,440 Implemented
KS2311 # 02 Y:2023 02 2023 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $19,596 $10,708 Not Implemented
KS2311 # 03 Y:2023 03 2023 INSULATE FEEDWATER TANK $4,841 $4,104 Not Implemented
KS2311 # 04 Y:2023 04 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $13,819 $3,753 Not Implemented
KS2311 # 05 Y:2023 05 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,129 $0 Not Implemented
KS2311 # 06 Y:2023 06 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $66,324 $627,000 Not Implemented
KS2311 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $57,047 $422,421 Not Implemented
SD0627 # 01 Y:2023 01 2023 INSULATE BARE EQUIPMENT $634 $2,128 Not Implemented
SD0627 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,041 $48,250 Not Implemented