Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
101
matching recommendationsNAICS | 32619 | Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1912 # 04 Y:2019 | 04 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $8,080 | $363 | Not Implemented |
UK1912 # 05 Y:2019 | 05 | 2019 | INSTALL OCCUPANCY SENSORS | $1,123 | $3,378 | Not Implemented |
UK1912 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $28,487 | $2,150 | Implemented |
UK1912 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,541 | $0 | Implemented |
UK1912 # 01 Y:2019 | 01 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,744 | $8,695 | Not Implemented |
UK1912 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,364 | $30,555 | Implemented |
UK1805 # 08 Y:2018 | 08 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,637 | $750 | n/a |
UK1805 # 06 Y:2018 | 06 | 2018 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $495 | $1,250 | n/a |
UK1805 # 07 Y:2018 | 07 | 2018 | INSULATE BARE EQUIPMENT | $338 | $365 | n/a |
UK1805 # 02 Y:2018 | 02 | 2018 | INSTALL OCCUPANCY SENSORS | $2,317 | $3,179 | n/a |
UK1805 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $288 | $601 | n/a |
UK1805 # 05 Y:2018 | 05 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $409 | $570 | n/a |
UK1805 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,688 | $18,720 | n/a |
UK1805 # 09 Y:2018 | 09 | 2018 | MOVE PRODUCT USING MECHANICAL MEANS | $27,500 | $19,000 | n/a |
UK1805 # 04 Y:2018 | 04 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,147 | $1,316 | n/a |
UK1804 # 10 Y:2018 | 10 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,686 | $1,200 | n/a |
UK1804 # 01 Y:2018 | 01 | 2018 | INSTALL OCCUPANCY SENSORS | $1,020 | $1,734 | n/a |
UK1804 # 04 Y:2018 | 04 | 2018 | USE ONLY CERTIFIED MOTOR REPAIR SHOPS | $195 | $238 | n/a |
UK1804 # 03 Y:2018 | 03 | 2018 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,644 | $147 | n/a |
UK1804 # 06 Y:2018 | 06 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $459 | $1,500 | n/a |
UK1804 # 05 Y:2018 | 05 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,550 | $2,320 | n/a |
UK1804 # 08 Y:2018 | 08 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,253 | $9,350 | n/a |
UK1804 # 07 Y:2018 | 07 | 2018 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $2,031 | $0 | n/a |
UK1804 # 09 Y:2018 | 09 | 2018 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,112 | $1,500 | n/a |
UK1804 # 14 Y:2018 | 14 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,393 | $1,316 | n/a |