IAC Assessment: UK1805
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UK1805
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Kentucky
Assessment Year 2018
Principal Product Plastic Products
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 190
Plant Area (Sq.Ft.) 80,000
Annual Production 28,757,305 Pieces
Production Hrs. Annual 6,240
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $68,197 1,974,000 kWh $0.03
Electricity Demand $114,560 8,595 kW-months/year $13.33
Electricity Fees $4,407 - $ -
Natural Gas $14,061 2,027 MMBtu $6.94
TOTAL ENERGY COSTS $201,440
RECOMMENDED SAVINGS* $45,819 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal By-product Production Electricity Usage Electricity Demand Natural Gas Water Disposal By-product Production
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$288
Cost:
$601
$189 5,397 $99 7 - - - - - - $189
5,397
kWh
$99
7
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,317
Cost:
$3,179
$2,317 66,207 - - - - - - - - $2,317
66,207
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,688
Cost:
$18,720
$3,490 99,727 $7,198 540 - - - - - - $3,490
99,727
kWh
$7,198
540
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$1,147
Cost:
$1,316
- - - - - - $1,147 655 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,147
655
Tgal
-
-
$
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$409
Cost:
$570
$128 3,661 $281 21 - - - - - - $128
3,661
kWh
$281
21
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$495
Cost:
$1,250
$495 14,147 - - - - - - - - $495
14,147
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$338
Cost:
$365
$125 3,567 $213 16 - - - - - - $125
3,567
kWh
$213
16
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,637
Cost:
$750
- - - - $2,637 380 - - - - -
-
kWh
-
-
kW-months/year
$2,637
380
MMBtu
-
-
Tgal
-
-
$
09: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$27,500
Cost:
$19,000
- - - - - - - - $27,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$27,500
-
$
TOTAL RECOMMENDED Savings:
$45,819
Cost:
$45,751
$6,744 192,706 $7,791 584 $2,637 380 $1,147 655 $27,500 - $6,744
192,706
kWh
$7,791
584
kW-months/year
$2,637
380
MMBtu
$1,147
655
Tgal
$27,500
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal By-product Production Electricity Usage Electricity Demand Natural Gas Water Disposal By-product Production