IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,830

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0302 # 01 Y:2020 01 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,015 $4,700 Implemented
MZ0302 # 02 Y:2020 02 2020 RECOVER WASTE HEAT FROM EQUIPMENT $19,767 $14,500 Not Implemented
MZ0302 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $251 $226 Not Implemented
MZ0302 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $217 $45 Implemented
MZ0302 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,817 $55,992 Implemented
MZ0302 # 06 Y:2020 06 2020 INSTALL OCCUPANCY SENSORS $2,138 $1,800 Not Implemented
AM0813 # 01 Y:2020 01 2020 OPTIMIZE PLANT POWER FACTOR $9,070 $14,280 Not Implemented
AM0813 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,260 $2,000 Implemented
AM0813 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,370 $6,880 Implemented
AM0813 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,380 $13 Implemented
AM0813 # 05 Y:2020 05 2020 PAY UTILITY BILLS ON TIME $1,735 $0 Implemented
AM0813 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $980 $1,040 Implemented
CL2013 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,650 $33,470 Implemented
CL2013 # 02 Y:2020 02 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,416 $4,336 Implemented
CL2013 # 03 Y:2020 03 2020 ISOLATE HOT OR COLD EQUIPMENT $1,527 $461 Implemented
CL2013 # 04 Y:2020 04 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,311 $0 Implemented
BS0137 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,104 $0 Implemented
BS0137 # 02 Y:2020 02 2020 REDUCE VENTILATION AIR $2,625 $7,998 Not Implemented
BS0137 # 03 Y:2020 03 2020 UPGRADE OBSOLETE EQUIPMENT $4,702 $21,000 Not Implemented
BS0137 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $1,055 $1,765 Not Implemented
BS0137 # 05 Y:2020 05 2020 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $13,551 $13,500 Not Implemented
BS0137 # 06 Y:2020 06 2020 LOWER CEILING TO REDUCE CONDITIONED SPACE $14,705 $45,023 Not Implemented
TR0027 # 01 Y:2020 01 2020 USE OPTIMUM THICKNESS INSULATION $5,150 $2,324 Implemented
TR0027 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,123 $1,562 Implemented
TR0027 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,856 $4,480 Implemented