IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,921

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0123 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $775 $835 Not Implemented
TT0123 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,294 $27,232 Not Implemented
TT0123 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,752 $10,856 Not Implemented
TT0123 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,151 $64,014 Not Implemented
TT0123 # 07 Y:2013 07 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,774 $500 Implemented
TT0123 # 08 Y:2013 08 2013 COMBINE UTILITY METERS $71,348 $9,384 Not Implemented
TT0123 # 09 Y:2013 09 2013 APPLY FOR INVESTMENT INCENTIVES $305 $0 Implemented
TT0123 # 10 Y:2013 10 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,590 $6,000 Implemented
WM0036 # 01 Y:2013 01 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $288 $0 Implemented
WM0036 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $396 $200 Not Implemented
WM0036 # 03 Y:2013 03 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $783 $4,255 Not Implemented
WM0036 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $1,540 $5,355 Not Implemented
WM0036 # 05 Y:2013 05 2013 IMPROVE SPACE COMFORT CONDITIONING $3,641 $595 Not Implemented
WM0036 # 06 Y:2013 06 2013 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $7,574 $780 Not Implemented
WM0036 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,340 $1,900 Implemented
NC0503 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $128,043 $171,848 Not Implemented
NC0503 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,179 $7,472 Not Implemented
NC0503 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $16,865 $10,990 Not Implemented
NC0503 # 04 Y:2013 04 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $107,579 $110,000 Not Implemented
NC0503 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $7,771 $1,900 Not Implemented
NC0503 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,944 $3,969 Not Implemented
NC0503 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,203 $100 Implemented
MZ0133 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $109,110 $85,800 Implemented
MZ0133 # 02 Y:2013 02 2013 COMBINE UTILITY METERS $40,487 $25,000 Not Implemented
MZ0133 # 03 Y:2013 03 2013 OPTIMIZE PLANT POWER FACTOR $34,640 $92,500 Implemented