IAC Assessment: BD0444
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0444
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2014
Principal Product Extruded Polystyrene Sheet
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 107
Plant Area (Sq.Ft.) 100,000
Annual Production 93,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,349,306 30,905,439 kWh $0.04
Electricity Demand $384,198 52,524 kW-months/year $7.31
Electricity Fees $18,142 - $ -
Natural Gas $136,096 25,916 MMBtu $5.25
TOTAL ENERGY COSTS $1,887,742
RECOMMENDED SAVINGS* $585,322 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,722
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$56,158
Cost:
$204,710
$45,689 1,045,507 $10,469 1,432 - - - - - - $45,689
1,045,507
kWh
$10,469
1,432
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$54,135
Cost:
$150,000
$(-3,828) (-87,600) $(-658) (-90) $58,621 11,165 - - - - $(-3,828)
(-87,600)
kWh
$(-658)
(-90)
kW-months/year
$58,621
11,165
MMBtu
-
-
$
-
-
$
03: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$4,140
Cost:
$18,000
- - - - $4,140 788 - - - - -
-
kWh
-
-
kW-months/year
$4,140
788
MMBtu
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,722
Cost:
$300
$2,215 50,692 $507 69 - - - - - - $2,215
50,692
kWh
$507
69
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$2,193
Cost:
$37
- - $2,193 300 - - - - - - -
-
kWh
$2,193
300
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$552
Cost:
$2,700
$230 5,269 $322 44 - - - - - - $230
5,269
kWh
$322
44
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$465,422
Cost:
$19,400
$(-1,238) (-28,333) - - - - $(-13,340) - $480,000 - $(-1,238)
(-28,333)
kWh
-
-
kW-months/year
-
-
MMBtu
$(-13,340)
-
$
$480,000
-
$
TOTAL RECOMMENDED Savings:
$585,322
Cost:
$395,147
$43,068 985,535 $12,833 1,756 $62,761 11,953 $(-13,340) - $480,000 - $43,068
985,535
kWh
$12,833
1,756
kW-months/year
$62,761
11,953
MMBtu
$(-13,340)
-
$
$480,000
-
$
TOTAL IMPLEMENTED Savings:
$2,722
Cost:
$300
$2,215 50,692 $507 69 - - - - - - $2,215
50,692
kWh
$507
69
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes