IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

117

matching recommendations
Reset
NAICS 326191 Plastics Plumbing Fixture Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0992 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $525 $1,755 Not Implemented
OK0992 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $171 $1,243 Not Implemented
OK0992 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $308 $259 Implemented
OK0992 # 09 Y:2018 09 2018 PAY UTILITY BILLS ON TIME $310 $0 Implemented
OK0992 # 08 Y:2018 08 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $360 $45 Not Implemented
OK0992 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $604 $450 Implemented
OK0992 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $208 $0 Implemented
OK0992 # 06 Y:2018 06 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,701 $15,796 Implemented
BS0004 # 02 Y:2012 02 2012 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $2,756 $802 Implemented
BS0004 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,092 $272 Implemented
BS0004 # 03 Y:2012 03 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,382 $5,000 Not Implemented
BS0004 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,570 $3,866 Not Implemented
BS0004 # 05 Y:2012 05 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $653 $885 Not Implemented
BS0004 # 06 Y:2012 06 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,840 $34 Implemented
BS0004 # 07 Y:2012 07 2012 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,240 $119 Not Implemented
UM0374 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $1,765 $2,250 Not Implemented
UM0374 # 07 Y:2010 07 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $257 $93 Implemented
UM0374 # 05 Y:2010 05 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,662 $40,550 Not Implemented
UM0374 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,667 $200 Not Implemented
UM0374 # 04 Y:2010 04 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $15,389 $33,705 Not Implemented
UM0374 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,227 $6,400 Not Implemented
UM0374 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $10,185 $10,900 Implemented
LE0296 # 04 Y:2010 04 2010 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,340 $5,200 Not Implemented
LE0296 # 05 Y:2010 05 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $878 $2,338 Implemented
LE0296 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $418 $182 Implemented