IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,343

matching recommendations
Reset
NAICS 3262 Rubber Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0600 # 02 Y:2007 02 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,710 $150 Implemented
CO0600 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $620 $60 Implemented
CO0600 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $400 $190 Implemented
CO0600 # 05 Y:2007 05 2007 INSTALL COMMON HEADER ON COMPRESSORS $320 $3,450 Implemented
CO0600 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,770 $12,130 Not Implemented
CO0600 # 07 Y:2007 07 2007 USE SOLAR HEAT TO MAKE ELECTRICTY $1,560 $11,000 Implemented
CO0600 # 08 Y:2007 08 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,050 $6,160 Not Implemented
CO0600 # 09 Y:2007 09 2007 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $790 $0 Implemented
UA0002 # 01 Y:2007 01 2007 INSULATE BARE EQUIPMENT $20,117 $824 Not Implemented
UA0002 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $34,488 $1,462 Not Implemented
UA0002 # 03 Y:2007 03 2007 REPAIR AND ELIMINATE STEAM LEAKS $35,628 $600 Implemented
UA0002 # 04 Y:2007 04 2007 METER WASTE WATER $6,725 $0 Not Implemented
UA0002 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,648 $15,057 Not Implemented
UA0002 # 06 Y:2007 06 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $11,078 $3,916 Implemented
UD0751 # 01 Y:2006 01 2006 REDUCE EXCESS STEAM BLEEDING $90,000 $18,000 Not Implemented
UD0751 # 02 Y:2006 02 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $63,687 $0 Implemented
UD0751 # 03 Y:2006 03 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $32,112 $0 Not Implemented
UD0751 # 04 Y:2006 04 2006 OPTIMIZE PLANT POWER FACTOR $21,149 $61,500 Not Implemented
UD0751 # 05 Y:2006 05 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $13,248 $10,000 Not Implemented
UD0751 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,066 $28,800 Not Implemented
UD0751 # 07 Y:2006 07 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,000 $0 Not Implemented
UD0751 # 08 Y:2006 08 2006 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $8,395 $2,000 Not Implemented
UD0751 # 09 Y:2006 09 2006 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $7,062 $12,000 Not Implemented
UD0751 # 10 Y:2006 10 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,759 $5,000 Implemented
TA0118 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,339 $2,016 Implemented