Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2008 |
Principal Product | Aerospace Fuel Cells/Iceguard |
NAICS | 326299 - All Other Rubber Product Manufacturing |
SIC | 3069 - Fabricated Rubber Products, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 920 |
Plant Area (Sq.Ft.) | 670,000 |
Annual Production | 21,000 Pieces |
Production Hrs. Annual | 4,160 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $905,255 | 12,276,474 | kWh | $0.07 |
Natural Gas | $744,102 | 95,287 | MMBtu | $7.81 |
TOTAL ENERGY COSTS | $1,649,357 | |||
RECOMMENDED SAVINGS* | $452,942 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $171,339 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Water Disposal | Ancillary Material Cost | Electricity Usage | Electricity Fees | Natural Gas | Water Disposal | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS |
Savings: $6,045 Cost: - |
- | - | - | - | $6,045 | 774 | - | - | - | - |
- - kWh |
- - $ |
$6,045 774 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD |
Savings: $1,512 Cost: - |
- | - | $1,512 | - | - | - | - | - | - | - |
- - kWh |
$1,512 - $ |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $27,999 Cost: $4,500 |
$32,999 | 420,480 | - | - | - | - | - | - | $(-5,000) | - |
$32,999 420,480 kWh |
- - $ |
- - MMBtu |
- - Tgal |
$(-5,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7291 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS |
Savings: $7,123 Cost: $3,000 |
$(-921) | (-12,432) | - | - | $8,044 | 1,030 | - | - | - | - |
$(-921) (-12,432) kWh |
- - $ |
$8,044 1,030 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT |
Savings: $73,789 Cost: $34,472 |
- | - | - | - | $73,789 | 9,448 | - | - | - | - |
- - kWh |
- - $ |
$73,789 9,448 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $46,634 Cost: $55,500 |
- | - | - | - | $46,634 | 5,971 | - | - | - | - |
- - kWh |
- - $ |
$46,634 5,971 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $10,989 Cost: $8,200 |
- | - | - | - | $10,989 | 1,407 | - | - | - | - |
- - kWh |
- - $ |
$10,989 1,407 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $1,629 Cost: $2,450 |
- | - | - | - | - | - | $1,629 | 312,000 | - | - |
- - kWh |
- - $ |
- - MMBtu |
$1,629 312,000 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR |
Savings: $148,679 Cost: $40,000 |
- | - | - | - | $148,679 | 19,037 | - | - | - | - |
- - kWh |
- - $ |
$148,679 19,037 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $128,543 Cost: $230,470 |
$128,543 | 1,637,908 | - | - | - | - | - | - | - | - |
$128,543 1,637,908 kWh |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $452,942 Cost: $378,592 |
$160,621 | 2,045,956 | $1,512 | - | $294,180 | 37,667 | $1,629 | 312,000 | $(-5,000) | - | $160,621 2,045,956 kWh |
$1,512 - $ |
$294,180 37,667 MMBtu |
$1,629 312,000 Tgal |
$(-5,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $171,339 Cost: $240,420 |
$160,621 | 2,045,956 | - | - | $14,089 | 1,804 | $1,629 | 312,000 | $(-5,000) | - | $160,621 2,045,956 kWh |
- - $ |
$14,089 1,804 MMBtu |
$1,629 312,000 Tgal |
$(-5,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Water Disposal | Ancillary Material Cost | Electricity Usage | Electricity Fees | Natural Gas | Water Disposal | Ancillary Material Cost |