Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsNAICS | 32621 | Tire Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0317 # 06 Y:2024 | 06 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $169,411 | $120,000 | n/a |
TT0317 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $2,015 | $1,364 | n/a |
TT0317 # 04 Y:2024 | 04 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $19,788 | $13,300 | n/a |
TT0317 # 03 Y:2024 | 03 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $859 | $400 | n/a |
TT0317 # 02 Y:2024 | 02 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $79,406 | $13,250 | n/a |
TT0317 # 01 Y:2024 | 01 | 2024 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $374,993 | $42,000 | n/a |
TT0317 # 09 Y:2024 | 09 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $6,847 | $8,500 | n/a |
TT0317 # 14 Y:2024 | 14 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $698 | $2,910 | n/a |
TT0317 # 15 Y:2024 | 15 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,295 | $40,000 | n/a |
TT0317 # 11 Y:2024 | 11 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,558 | $39,000 | n/a |
TT0317 # 16 Y:2024 | 16 | 2024 | UPGRADE OBSOLETE EQUIPMENT | $4,116 | $50,000 | n/a |
TT0317 # 12 Y:2024 | 12 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,299 | $16,125 | n/a |
TT0317 # 10 Y:2024 | 10 | 2024 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $56,902 | $80,000 | n/a |
TT0317 # 08 Y:2024 | 08 | 2024 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $64,353 | $60,000 | n/a |
TT0317 # 13 Y:2024 | 13 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $205,758 | $600,000 | n/a |
TT0317 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,968 | $2,475 | n/a |
TT0214 # 01 Y:2019 | 01 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $223,429 | $3,000 | Implemented |
TT0214 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $64,974 | $152,490 | Not Implemented |
TT0214 # 03 Y:2019 | 03 | 2019 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $24,664 | $106,000 | Not Implemented |
TT0214 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,330 | $66,000 | Not Implemented |
TT0214 # 05 Y:2019 | 05 | 2019 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $23,715 | $75,000 | Not Implemented |
TT0214 # 06 Y:2019 | 06 | 2019 | OPTIMIZE PLANT POWER FACTOR | $13,401 | $5,000 | Implemented |
TT0214 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,443 | $15,674 | Not Implemented |
TT0132 # 06 Y:2014 | 06 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,643 | $0 | Not Implemented |
TT0132 # 05 Y:2014 | 05 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $894 | $1,750 | Not Implemented |