IAC Assessment: TT0317
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0317
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2024
Principal Product Off-Road Tires
NAICS 326211 - Tire Manufacturing (except Retreading)
SIC 3011 - Tires And Inner Tubes
Sales $100,000,000-$500,000,000
# of Employees 275
Plant Area (Sq.Ft.) 320,000
Annual Production 1,092,000 Pieces
Production Hrs. Annual 4,160
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $839,197 18,302,472 kWh $0.05
Electricity Demand $539,202 90,279 kW-months/year $5.97
Natural Gas $872,829 173,656 MMBtu $5.03
TOTAL ENERGY COSTS $2,293,099
RECOMMENDED SAVINGS* $1,025,264 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $
01: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$374,993
Cost:
$42,000
- - - - - - - - - - $374,993 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$374,993
-
$
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$79,406
Cost:
$13,250
- - - - $79,406 15,799 - - - - - - -
-
kWh
-
-
kW-months/year
$79,406
15,799
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$859
Cost:
$400
$859 18,452 - - - - - - - - - - $859
18,452
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$19,788
Cost:
$13,300
- - - - $19,788 3,937 - - - - - - -
-
kWh
-
-
kW-months/year
$19,788
3,937
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,015
Cost:
$1,364
- - - - $2,015 401 - - - - - - -
-
kWh
-
-
kW-months/year
$2,015
401
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$169,411
Cost:
$120,000
- - - - - - - - - - $169,411 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$169,411
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,968
Cost:
$2,475
$2,968 62,688 - - - - - - - - - - $2,968
62,688
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
08: 4.721 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION Savings:
$64,353
Cost:
$60,000
$32,058 677,191 - - $32,295 6,425 - - - - - - $32,058
677,191
kWh
-
-
kW-months/year
$32,295
6,425
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
09: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$6,847
Cost:
$8,500
$6,847 144,624 - - - - - - - - - - $6,847
144,624
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
10: 2.1242 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT Savings:
$56,902
Cost:
$80,000
- - - - $21,040 4,186 $9,090 2,561 $15,052 2,561 $11,720 - -
-
kWh
-
-
kW-months/year
$21,040
4,186
MMBtu
$9,090
2,561
Tgal
$15,052
2,561
Tgal
$11,720
-
$
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$22,558
Cost:
$39,000
$21,103 445,767 $1,456 244 - - - - - - - - $21,103
445,767
kWh
$1,456
244
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
12: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,299
Cost:
$16,125
$6,299 133,058 - - - - - - - - - - $6,299
133,058
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
13: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$205,758
Cost:
$600,000
$(-6,013) (-127,020) $(-1,039) (-174) - - - - - - $212,810 - $(-6,013)
(-127,020)
kWh
$(-1,039)
(-174)
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$212,810
-
$
14: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$698
Cost:
$2,910
$407 8,603 $290 49 - - - - - - - - $407
8,603
kWh
$290
49
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
15: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$8,295
Cost:
$40,000
$8,295 175,221 - - - - - - - - - - $8,295
175,221
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
16: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$4,116
Cost:
$50,000
$3,481 73,534 $635 106 - - - - - - - - $3,481
73,534
kWh
$635
106
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$1,025,264
Cost:
$1,089,324
$76,304 1,612,119 $1,341 225 $154,544 30,748 $9,090 2,561 $15,052 2,561 $768,934 - $76,304
1,612,119
kWh
$1,341
225
kW-months/year
$154,544
30,748
MMBtu
$9,090
2,561
Tgal
$15,052
2,561
Tgal
$768,934
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal One-time Revenue or Avoided Cost