IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

264

matching recommendations
Reset
NAICS 326220 Rubber and Plastics Hoses and Belting Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0461 # 09 Y:2015 09 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,734 $1,500 Not Implemented
BD0461 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,179 $1,665 Not Implemented
BD0461 # 11 Y:2015 11 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $874 $20 Implemented
BD0461 # 12 Y:2015 12 2015 INSTALL AUTOMATIC STACK DAMPER $871 $1,500 Not Implemented
BD0461 # 13 Y:2015 13 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,229 $1,500 Not Implemented
BD0461 # 14 Y:2015 14 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $547 $486 Implemented
BD0461 # 15 Y:2015 15 2015 INSTALL OCCUPANCY SENSORS $526 $675 Not Implemented
BD0461 # 16 Y:2015 16 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $230 $20 Implemented
BD0442 # 01 Y:2014 01 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,957 $8,000 Not Implemented
BD0442 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,866 $17,640 Not Implemented
BD0442 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $724 $600 Not Implemented
TT0115 # 01 Y:2013 01 2013 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $18,000 $50,000 Implemented
TT0115 # 02 Y:2013 02 2013 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $18,000 $50,000 Implemented
TT0115 # 03 Y:2013 03 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,000 $50,000 Not Implemented
TT0115 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $32,990 $129,250 Not Implemented
TT0115 # 05 Y:2013 05 2013 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $146,360 $450,000 Not Implemented
TT0115 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,000 $4,000 Not Implemented
TT0115 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,635 $2,500 Not Implemented
TT0115 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,984 $20,000 Not Implemented
TT0115 # 09 Y:2013 09 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,635 $20,000 Not Implemented
IA0501 # 01 Y:2013 01 2013 AIR CONDITION ONLY SPACE NECESSARY $4,234 $2,800 Implemented
IA0501 # 02 Y:2013 02 2013 ISOLATE HOT OR COLD EQUIPMENT $705 $840 Not Implemented
IA0501 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $819 $2,680 Implemented
IA0501 # 04 Y:2013 04 2013 DIRECT WARMEST AIR TO COMBUSTION INTAKE $486 $334 Not Implemented
IA0501 # 05 Y:2013 05 2013 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,018 $22,500 Not Implemented