IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
NAICS 326291 Rubber Product Manufacturing for Mechanical Use
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0292 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,595 $1,660 Implemented
MI0292 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,974 $40 Not Implemented
MI0292 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,028 $8,642 Not Implemented
MI0292 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $4,106 $884 Implemented
MI0292 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,562 $1,832 Not Implemented
MI0292 # 07 Y:2016 07 2016 USE OPTIMUM THICKNESS INSULATION $2,670 $1,810 Implemented
MI0292 # 08 Y:2016 08 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,585 $670 Not Implemented
MI0292 # 09 Y:2016 09 2016 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,313 $480 Not Implemented
MI0292 # 10 Y:2016 10 2016 USE PHOTOCELL CONTROLS $183 $480 Implemented
MI0292 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,353 $95,355 Implemented
UF0401 # 10 Y:2007 10 2007 INSTALL EQUIPMENT TO MOVE PRODUCT $8,845 $43,500 Not Implemented
UF0401 # 09 Y:2007 09 2007 INSTALL EQUIPMENT TO MOVE PRODUCT $32,175 $1,260 Not Implemented
UF0401 # 08 Y:2007 08 2007 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,850 $957 Not Implemented
UF0401 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,239 $638 Implemented
UF0401 # 06 Y:2007 06 2007 IMPROVE SPACE COMFORT CONDITIONING $13,160 $26,800 Not Implemented
UF0401 # 05 Y:2007 05 2007 ELIMINATE A BY-PRODUCT $3,032 $158 Implemented
UF0401 # 04 Y:2007 04 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $1,673 $2,571 Implemented
UF0401 # 03 Y:2007 03 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,038 $0 Implemented
UF0401 # 02 Y:2007 02 2007 INSTALL SKYLIGHTS $6,200 $14,564 Not Implemented
UF0401 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,913 $36,935 Not Implemented