Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,659
matching recommendationsNAICS | 327 | Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2411 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $76,606 | $698,579 | n/a |
UL2411 # 05 Y:2024 | 05 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,372 | $5,000 | n/a |
UL2411 # 06 Y:2024 | 06 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $35,308 | $50,000 | n/a |
UL2411 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,717 | $1,995 | n/a |
UL2411 # 04 Y:2024 | 04 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $4,053 | $13,653 | n/a |
UL2411 # 02 Y:2024 | 02 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $746 | $2,700 | n/a |
UA0288 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $290,423 | $2,558,734 | n/a |
UA0288 # 06 Y:2024 | 06 | 2024 | OPTIMIZE PLANT POWER FACTOR | $8,607 | $5,049 | n/a |
UA0288 # 01 Y:2024 | 01 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,634 | $1,046 | n/a |
UA0288 # 09 Y:2024 | 09 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,856 | $4,621 | n/a |
UA0288 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,645 | $1,000 | n/a |
UA0288 # 08 Y:2024 | 08 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,656 | $994 | n/a |
UA0288 # 05 Y:2024 | 05 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,178 | $10,450 | n/a |
UA0288 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,987 | $8,591 | n/a |
UA0288 # 03 Y:2024 | 03 | 2024 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,549 | $1,031 | n/a |
TT0316 # 05 Y:2024 | 05 | 2024 | CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS | $18,330 | $3,200 | n/a |
TT0316 # 09 Y:2024 | 09 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,504 | $60 | n/a |
TT0316 # 01 Y:2024 | 01 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,156,718 | $75,000 | n/a |
TT0316 # 07 Y:2024 | 07 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,283 | $30 | n/a |
TT0316 # 10 Y:2024 | 10 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,587 | $1,500 | n/a |
TT0316 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $259,778 | $1,375,785 | n/a |
TT0316 # 11 Y:2024 | 11 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,763 | $1,345 | n/a |
TT0316 # 04 Y:2024 | 04 | 2024 | METER WASTE WATER | $22,342 | $10,000 | n/a |
TT0316 # 03 Y:2024 | 03 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $147,843 | $200,000 | n/a |
TT0316 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,806 | $12,000 | n/a |