IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

135

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0463 # 04 Y:2018 04 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,966 $4,800 Implemented
SU0463 # 05 Y:2018 05 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,314 $8,600 Not Implemented
SU0463 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,345 $14,020 Not Implemented
LE0455 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,359 $1,000 Not Implemented
LE0455 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,794 $850 Not Implemented
LE0455 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $3,012 $4,000 Not Implemented
LE0455 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,674 $12,500 Not Implemented
LE0455 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,889 $7,500 Not Implemented
LE0455 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,295 $9,500 Not Implemented
LE0455 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $799 $4,000 Not Implemented
UA0196 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,926 $41,196 Not Implemented
UA0196 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $894 $550 Implemented
UA0196 # 03 Y:2018 03 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,166 $1,227 Implemented
UA0196 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,798 $1,165 Implemented
UA0196 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,660 $100 Not Implemented
UA0196 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,085 $3,000 Not Implemented
UA0196 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $7,511 $3,443 Implemented
UA0196 # 08 Y:2018 08 2018 BURN A LESS EXPENSIVE GRADE OF FUEL $1,051 $1,325 Not Implemented
TT0210 # 01 Y:2018 01 2018 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $13,015 $9,600 Implemented
TT0210 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,663 $2,000 Implemented
TT0210 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $1,508 $3,630 Implemented
TT0210 # 04 Y:2018 04 2018 INSTALL TIMERS AND/OR THERMOSTATS $716 $250 Implemented
TT0210 # 05 Y:2018 05 2018 APPLY FOR INVESTMENT INCENTIVES $579 $100 Implemented
AM0754 # 01 Y:2018 01 2018 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $63,539 $195,000 Implemented
AM0754 # 02 Y:2018 02 2018 OPTIMIZE PLANT POWER FACTOR $7,740 $11,520 Implemented