Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,688
matching recommendationsNAICS | 327 | Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0086 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,877 | $1,280 | Implemented |
BS0086 # 05 Y:2016 | 05 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,268 | $147 | Not Implemented |
AM0713 # 01 Y:2016 | 01 | 2016 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $453,910 | $3,100,000 | Not Implemented |
AM0713 # 02 Y:2016 | 02 | 2016 | OPTIMIZE PLANT POWER FACTOR | $58,650 | $76,000 | Implemented |
AM0713 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,870 | $16,220 | Implemented |
AM0713 # 04 Y:2016 | 04 | 2016 | USE SYNTHETIC LUBRICANT | $4,600 | $0 | Implemented |
AM0713 # 05 Y:2016 | 05 | 2016 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,460 | $3,900 | Implemented |
MA0760 # 01 Y:2016 | 01 | 2016 | REPLACE BOILER | $8,072 | $36,600 | Not Implemented |
MA0760 # 02 Y:2016 | 02 | 2016 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,981 | $17,000 | Implemented |
MA0760 # 03 Y:2016 | 03 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,364 | $500 | Implemented |
MA0760 # 04 Y:2016 | 04 | 2016 | INSULATE BARE EQUIPMENT | $520 | $62 | Not Implemented |
UK1604 # 01 Y:2016 | 01 | 2016 | OPTIMIZE PLANT POWER FACTOR | $14,750 | $8,715 | Implemented |
UK1604 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,425 | $67,500 | Not Implemented |
UK1604 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $166 | $196 | Not Implemented |
UK1604 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $153 | $280 | Implemented |
UK1604 # 05 Y:2016 | 05 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,018 | $3,500 | Implemented |
UK1604 # 06 Y:2016 | 06 | 2016 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $2,304 | $3,620 | Implemented |
UK1604 # 07 Y:2016 | 07 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,094 | $5,000 | Implemented |
UK1604 # 08 Y:2016 | 08 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $56 | $61 | Implemented |
UK1604 # 09 Y:2016 | 09 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,645 | $1,200 | Not Implemented |
UK1604 # 10 Y:2016 | 10 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,729 | $6,000 | Not Implemented |
WV0528 # 01 Y:2016 | 01 | 2016 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $14,934 | $6,000 | Not Implemented |
WV0528 # 02 Y:2016 | 02 | 2016 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $10,411 | $5,250 | Implemented |
WV0528 # 03 Y:2016 | 03 | 2016 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $10,032 | $1,000 | Implemented |
WV0528 # 04 Y:2016 | 04 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,408 | $100 | Not Implemented |