Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsNAICS | 327 | Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0283 # 01 Y:2023 | 01 | 2023 | INSULATE BARE EQUIPMENT | $112 | $886 | n/a |
IC0283 # 02 Y:2023 | 02 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $192 | $13 | n/a |
IC0283 # 03 Y:2023 | 03 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,791 | $4,650 | n/a |
IC0283 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $350 | $840 | n/a |
IP0174 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $80,518 | $123,235 | Implemented |
IP0174 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,006 | $2,730 | Implemented |
IP0174 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $76,877 | $14,812 | Implemented |
IP0174 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,401 | $1,048 | Implemented |
IP0174 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $28,594 | $78,000 | Not Implemented |
IP0174 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $42,275 | $0 | Implemented |
IP0144 # 01 Y:2020 | 01 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,556 | $0 | Implemented |
IP0144 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,442 | $22,030 | Implemented |
IP0144 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $194 | $195 | Implemented |
IP0144 # 04 Y:2020 | 04 | 2020 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $8,469 | $3,263 | Not Implemented |
IP0144 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,747 | $85 | Implemented |
IP0144 # 02 Y:2020 | 02 | 2020 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $2,096 | $0 | Implemented |
UD0777 # 04 Y:2008 | 04 | 2008 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $70,469 | $40,000 | Implemented |
UD0777 # 01 Y:2008 | 01 | 2008 | $621,360 | $28,800 | Not Implemented | |
UD0777 # 02 Y:2008 | 02 | 2008 | SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM | $468,137 | $140,000 | Not Implemented |
UD0777 # 03 Y:2008 | 03 | 2008 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $86,400 | $85,000 | Not Implemented |
UD0777 # 07 Y:2008 | 07 | 2008 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $35,347 | $15,000 | Implemented |
UD0777 # 05 Y:2008 | 05 | 2008 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $45,421 | $74,873 | Not Implemented |
UD0777 # 09 Y:2008 | 09 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $18,821 | $1,900 | Not Implemented |
UD0777 # 06 Y:2008 | 06 | 2008 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $35,664 | $50,000 | Implemented |
UD0777 # 08 Y:2008 | 08 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $33,252 | $1,000 | Implemented |