Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsNAICS | 327 | Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0231 # 08 Y:2024 | 08 | 2024 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $266,000 | $385,800 | Not Implemented |
DL0231 # 07 Y:2024 | 07 | 2024 | IMPROVE COMBUSTION CONTROL CAPABILITY | $211,766 | $21,800 | Not Implemented |
DL0231 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $172,461 | $34,600 | Not Implemented |
DL0231 # 02 Y:2024 | 02 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $229,694 | $2,880,000 | Not Implemented |
DL0231 # 03 Y:2024 | 03 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $149,450 | $333,800 | Not Implemented |
DL0231 # 04 Y:2024 | 04 | 2024 | INSULATE BARE EQUIPMENT | $25,112 | $9,768 | Not Implemented |
DL0231 # 05 Y:2024 | 05 | 2024 | MAINTAIN MACHINES TO REDUCE LEAKS | $132,876 | $34,600 | Not Implemented |
DL0231 # 06 Y:2024 | 06 | 2024 | MAINTAIN MACHINES TO REDUCE LEAKS | $441,845 | $39,600 | Not Implemented |
DL0224 # 02 Y:2023 | 02 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $18,258 | $76,600 | Not Implemented |
DL0224 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $25,584 | $18,000 | Not Implemented |
DL0224 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,382 | $780 | Not Implemented |
DL0224 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN HIGH PRESSURE REDUCING STATIONS | $14,800 | $70,000 | Not Implemented |
WV0547 # 12 Y:2017 | 12 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $102 | $348 | Not Implemented |
WV0547 # 11 Y:2017 | 11 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $133 | $25 | Not Implemented |
WV0547 # 10 Y:2017 | 10 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $175 | $850 | Implemented |
WV0547 # 09 Y:2017 | 09 | 2017 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $243 | $1,000 | Implemented |
WV0547 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $412 | $2,050 | Implemented |
WV0547 # 07 Y:2017 | 07 | 2017 | USE EVAPORATION TO CONCENTRATE MATERIAL | $563 | $700 | Not Implemented |
WV0547 # 06 Y:2017 | 06 | 2017 | ADJUST BURNERS FOR EFFICIENT OPERATION | $970 | $4,600 | Implemented |
WV0547 # 05 Y:2017 | 05 | 2017 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $1,360 | $2,700 | Not Implemented |
WV0547 # 04 Y:2017 | 04 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,796 | $1,263 | Not Implemented |
WV0547 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,491 | $9,434 | Implemented |
WV0547 # 02 Y:2017 | 02 | 2017 | IMPROVE COMBUSTION CONTROL CAPABILITY | $7,947 | $25,500 | Not Implemented |
WV0547 # 01 Y:2017 | 01 | 2017 | INSULATE BARE EQUIPMENT | $15,992 | $5,658 | Implemented |