IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0231 # 08 Y:2024 08 2024 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $266,000 $385,800 Not Implemented
DL0231 # 07 Y:2024 07 2024 IMPROVE COMBUSTION CONTROL CAPABILITY $211,766 $21,800 Not Implemented
DL0231 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $172,461 $34,600 Not Implemented
DL0231 # 02 Y:2024 02 2024 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $229,694 $2,880,000 Not Implemented
DL0231 # 03 Y:2024 03 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $149,450 $333,800 Not Implemented
DL0231 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $25,112 $9,768 Not Implemented
DL0231 # 05 Y:2024 05 2024 MAINTAIN MACHINES TO REDUCE LEAKS $132,876 $34,600 Not Implemented
DL0231 # 06 Y:2024 06 2024 MAINTAIN MACHINES TO REDUCE LEAKS $441,845 $39,600 Not Implemented
DL0224 # 02 Y:2023 02 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $18,258 $76,600 Not Implemented
DL0224 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,584 $18,000 Not Implemented
DL0224 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,382 $780 Not Implemented
DL0224 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN HIGH PRESSURE REDUCING STATIONS $14,800 $70,000 Not Implemented
WV0547 # 12 Y:2017 12 2017 DEVELOP A REPAIR/REPLACE POLICY $102 $348 Not Implemented
WV0547 # 11 Y:2017 11 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $133 $25 Not Implemented
WV0547 # 10 Y:2017 10 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $175 $850 Implemented
WV0547 # 09 Y:2017 09 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $243 $1,000 Implemented
WV0547 # 08 Y:2017 08 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $412 $2,050 Implemented
WV0547 # 07 Y:2017 07 2017 USE EVAPORATION TO CONCENTRATE MATERIAL $563 $700 Not Implemented
WV0547 # 06 Y:2017 06 2017 ADJUST BURNERS FOR EFFICIENT OPERATION $970 $4,600 Implemented
WV0547 # 05 Y:2017 05 2017 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,360 $2,700 Not Implemented
WV0547 # 04 Y:2017 04 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,796 $1,263 Not Implemented
WV0547 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,491 $9,434 Implemented
WV0547 # 02 Y:2017 02 2017 IMPROVE COMBUSTION CONTROL CAPABILITY $7,947 $25,500 Not Implemented
WV0547 # 01 Y:2017 01 2017 INSULATE BARE EQUIPMENT $15,992 $5,658 Implemented