IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
NAICS 32712 Clay Building Material and Refractories Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0431 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,312 $0 Implemented
SU0431 # 03 Y:2016 03 2016 INSULATE FEEDWATER TANK $162 $56 Implemented
SU0431 # 04 Y:2016 04 2016 ELIMINATE/REDUCE AN OPERATION $10,608 $4,074 Not Implemented
SU0431 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $391 $388 Not Implemented
SU0431 # 06 Y:2016 06 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $428 $991 Implemented
SU0431 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $132 $393 Implemented
SU0431 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $757 $3,080 Implemented
SU0431 # 01 Y:2016 01 2016 DISCONNECT BALLASTS $270 $0 Implemented
TT0181 # 06 Y:2016 06 2016 RECOVER WASTE HEAT FROM EQUIPMENT $6,973 $6,000 Implemented
TT0181 # 10 Y:2016 10 2016 OPTIMIZE PLANT POWER FACTOR $3,012 $8,000 Implemented
TT0181 # 09 Y:2016 09 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,058 $3,050 Implemented
TT0181 # 08 Y:2016 08 2016 RECOVER WASTE HEAT FROM EQUIPMENT $3,794 $500 Not Implemented
TT0181 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,976 $13,245 Implemented
TT0181 # 05 Y:2016 05 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,573 $7,000 Implemented
TT0181 # 04 Y:2016 04 2016 INSULATE BARE EQUIPMENT $12,441 $27,333 Not Implemented
TT0181 # 03 Y:2016 03 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $25,164 $10,000 Implemented
TT0181 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $31,353 $38,924 Not Implemented
TT0181 # 01 Y:2016 01 2016 RECOVER WASTE HEAT FROM EQUIPMENT $35,984 $24,000 Not Implemented
WV0528 # 01 Y:2016 01 2016 USE DEMAND CONTROLLER OR LOAD SHEDDER $14,934 $6,000 Not Implemented
WV0528 # 02 Y:2016 02 2016 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $10,411 $5,250 Implemented
WV0528 # 03 Y:2016 03 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $10,032 $1,000 Implemented
WV0528 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,408 $100 Not Implemented
WV0528 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,004 $325 Implemented
WV0528 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $3,329 $1,820 Not Implemented
WV0528 # 07 Y:2016 07 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,820 $1,500 Implemented