IAC logo
IAC Assessment: WV0528
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0528
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2016
Principal Product Refractory Material
NAICS 327120 - Clay Building Material and Refractories Manufacturing
SIC 3297 - Nonclay Refractories
Sales $50,000,000-$100,000,000
# of Employees 20
Plant Area (Sq.Ft.) 120,000
Annual Production 70,000 Tons
Production Hrs. Annual 4,160
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $136,602 3,091,003 kWh $0.04
Electricity Demand $210,753 10,314 kW-months/year $20.43
Natural Gas $4,612 600 MMBtu $7.69
TOTAL ENERGY COSTS $351,967
RECOMMENDED SAVINGS* $57,843 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,172
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$14,934
Cost:
$6,000
- - $14,934 731 - - -
-
kWh
$14,934
731
kW-months/year
-
-
$
02: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$10,411
Cost:
$5,250
$4,466 101,050 $5,945 291 - - $4,466
101,050
kWh
$5,945
291
kW-months/year
-
-
$
03: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$10,032
Cost:
$1,000
$5,417 122,557 $7,232 354 $(-2,617) - $5,417
122,557
kWh
$7,232
354
kW-months/year
$(-2,617)
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$8,408
Cost:
$100
$3,607 81,617 $4,801 235 - - $3,607
81,617
kWh
$4,801
235
kW-months/year
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,004
Cost:
$325
$2,144 48,506 $2,860 140 - - $2,144
48,506
kWh
$2,860
140
kW-months/year
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,329
Cost:
$1,820
$1,429 32,330 $1,900 93 - - $1,429
32,330
kWh
$1,900
93
kW-months/year
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,820
Cost:
$1,500
$1,206 27,289 $1,614 79 - - $1,206
27,289
kWh
$1,614
79
kW-months/year
-
-
$
08: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,959
Cost:
$904
$972 22,000 $1,287 63 $(-300) - $972
22,000
kWh
$1,287
63
kW-months/year
$(-300)
-
$
09: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$635
Cost:
$3,000
$635 14,357 - - - - $635
14,357
kWh
-
-
kW-months/year
-
-
$
10: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$311
Cost:
$297
$133 3,007 $178 9 - - $133
3,007
kWh
$178
9
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$57,843
Cost:
$20,196
$20,009 452,713 $40,751 1,995 $(-2,917) - $20,009
452,713
kWh
$40,751
1,995
kW-months/year
$(-2,917)
-
$
TOTAL IMPLEMENTED Savings:
$31,172
Cost:
$12,276
$14,973 338,766 $19,116 936 $(-2,917) - $14,973
338,766
kWh
$19,116
936
kW-months/year
$(-2,917)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes