IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
NAICS 3272 Glass and Glass Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW0028 # 08 Y:2009 08 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $144 $0 Implemented
UW0028 # 07 Y:2009 07 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $847 $560 Not Implemented
UW0028 # 06 Y:2009 06 2009 METER WASTE WATER $1,060 $12,000 Implemented
UW0028 # 05 Y:2009 05 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,663 $31,539 Not Implemented
UW0028 # 01 Y:2009 01 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,467,516 $2,201,270 Not Implemented
UW0028 # 02 Y:2009 02 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $323,442 $485,164 Not Implemented
UW0028 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,942 $76,700 Implemented
UW0028 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $12,524 $1,960 Implemented
OR0531 # 02 Y:2008 02 2008 OPTIMIZE PLANT POWER FACTOR $20,000 $87,500 Not Implemented
OR0531 # 05 Y:2008 05 2008 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $32,266 $3,000 Not Implemented
OR0531 # 04 Y:2008 04 2008 CLEAR AND RENT EXISTING SPACE $24,000 $0 Not Implemented
OR0531 # 03 Y:2008 03 2008 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $2,400 $0 Not Implemented
OR0531 # 01 Y:2008 01 2008 INSTALL OCCUPANCY SENSORS $2,818 $2,800 Not Implemented
UW0002 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,263 $85,000 Not Implemented
UW0002 # 02 Y:2007 02 2007 OPTIMIZE PLANT POWER FACTOR $10,893 $16,323 Not Implemented
UW0002 # 03 Y:2007 03 2007 RECOVER WASTE HEAT FROM EQUIPMENT $8,000 $9,385 Implemented
UW0002 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $5,998 $2,692 Implemented
UW0002 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $700 $252 Implemented
UW0002 # 06 Y:2007 06 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $906 $653 Not Implemented
UW0002 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $153 $200 Implemented