Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
769
matching recommendationsNAICS | 32721 | Glass and Glass Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0769 # 01 Y:2008 | 01 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $53,558 | $2,347 | Not Implemented |
OK0769 # 02 Y:2008 | 02 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $18,368 | $731 | Not Implemented |
OK0769 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $788 | $1,922 | Implemented |
OK0769 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $98,641 | $246,228 | Not Implemented |
OK0769 # 05 Y:2008 | 05 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,911 | $4,475 | Implemented |
OK0769 # 06 Y:2008 | 06 | 2008 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $2,068 | $200 | Not Implemented |
OK0769 # 07 Y:2008 | 07 | 2008 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $451,827 | $2,500,000 | Not Implemented |
MI0173 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,483 | $21,312 | Not Implemented |
MI0173 # 02 Y:2008 | 02 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,156 | $30,132 | Not Implemented |
MI0173 # 03 Y:2008 | 03 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,609 | $1,563 | Implemented |
MI0173 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,203 | $950 | Implemented |
MI0173 # 05 Y:2008 | 05 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,034 | $7,000 | Implemented |
MI0173 # 06 Y:2008 | 06 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,963 | $1,210 | Implemented |
MI0173 # 07 Y:2008 | 07 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,484 | $4,400 | Implemented |
IA0435 # 01 Y:2008 | 01 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $9,332 | $252 | Implemented |
IA0435 # 02 Y:2008 | 02 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,663 | $45 | Not Implemented |
IA0435 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $978 | $240 | Implemented |
IA0435 # 04 Y:2008 | 04 | 2008 | COVER OPEN TANKS | $881 | $225 | Not Implemented |
IA0435 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,079 | $36,423 | Not Implemented |
IA0435 # 06 Y:2008 | 06 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,172 | $1,917 | Not Implemented |
IA0435 # 07 Y:2008 | 07 | 2008 | INSTALL OCCUPANCY SENSORS | $552 | $1,309 | Implemented |
IA0435 # 08 Y:2008 | 08 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,096 | $317 | Not Implemented |
IA0435 # 09 Y:2008 | 09 | 2008 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,838 | $15 | Implemented |
MI0172 # 01 Y:2008 | 01 | 2008 | RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION | $126,000 | $66,640 | Not Implemented |
MI0172 # 02 Y:2008 | 02 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $86,926 | $83,640 | Implemented |